0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Yoon, Sungboo / Park, Moonseo / Ahn, Changbum R. (2024): LaserDex: Improvising Spatial Tasks Using Deictic Gestures and Laser Pointing for Human–Robot Collaboration in Construction. In: Journal of Computing in Civil Engineering, v. 38, n. 3 (May 2024).

    https://doi.org/10.1061/jccee5.cpeng-5715

  2. Cho, Jongwoo / Song, Kwonsik / Kwon, Nahyun / Park, Moonseo / Kim, Tae Wan (2024): Effects of Periodic Materials on Distance Attenuation in Wall–Slab Structures: An Experiment. In: Buildings, v. 14, n. 3 (21 February 2024).

    https://doi.org/10.3390/buildings14030694

  3. Yoon, Inseok / Ahn, Changbum / Ahn, Seungjun / Lee, Bogyeong / Lee, Jongjik / Park, Moonseo (2024): Enhancing indoor building occupant safety in the built environment: Assessing the validity of social force modeling for simulating physical distancing behaviors. In: Developments in the Built Environment, v. 17 (March 2024).

    https://doi.org/10.1016/j.dibe.2024.100336

  4. Ishdorj, Saruul / Ahn, Changbum R. / Park, Moonseo (2024): Major Factors Influencing Safety Knowledge–Sharing Behaviors of Construction Field Workers: Worker-to-Worker Level Safety Communication. In: Journal of Construction Engineering and Management, v. 150, n. 4 (April 2024).

    https://doi.org/10.1061/jcemd4.coeng-14121

  5. Yoon, Sungboo / Kim, YeSeul / Park, Moonseo / Ahn, Changbum R. (2023): Effects of Spatial Characteristics on the Human–Robot Communication Using Deictic Gesture in Construction. In: Journal of Construction Engineering and Management, v. 149, n. 7 (July 2023).

    https://doi.org/10.1061/jcemd4.coeng-12997

  6. Moon, Hyosoo / Park, Moonseo / Ahn, Yonghan / Kwon, Nahyun (2023): Moderating Effect of Project Type on the Relationship between Project Delivery Systems and Cost Performance. In: Journal of Management in Engineering (ASCE), v. 39, n. 1 (January 2023).

    https://doi.org/10.1061/(asce)me.1943-5479.0001097

  7. Lee, Jin Gang / Lee, Hyun-Soo / Park, Moonseo / Seo, JoonOh (2021): Early-stage cost estimation model for power generation project with limited historical data. In: Engineering, Construction and Architectural Management, v. 29, n. 7 (July 2021).

    https://doi.org/10.1108/ecam-04-2020-0261

  8. Hyun, Hosang / Yoon, Inseok / Lee, Hyun-Soo / Park, Moonseo / Lee, Jeonghoon (2021): Multiobjective optimization for modular unit production lines focusing on crew allocation and production performance. In: Automation in Construction, v. 125 (May 2021).

    https://doi.org/10.1016/j.autcon.2021.103581

  9. Shin, Hyunji / Lee, Hyun-Soo / Park, Moonseo / Lee, Jin Gang (2018): Facility Management Process of an Office Building. In: Journal of Infrastructure Systems, v. 24, n. 3 (September 2018).

    https://doi.org/10.1061/(asce)is.1943-555x.0000436

  10. Choi, Minji / Lee, SangHyun / Park, Moonseo / Lee, Hyun-Soo (2018): Effect of Dynamic Emergency Cues on Fire Evacuation Performance in Public Buildings. In: Journal of Infrastructure Systems, v. 24, n. 4 (December 2018).

    https://doi.org/10.1061/(asce)is.1943-555x.0000449

  11. Anderson, Kyle / Song, Kwonsik / Lee, SangHyun / Lee, Hyunsoo / Park, Moonseo (2015): Energy consumption in households while unoccupied: Evidence from dormitories. In: Energy and Buildings, v. 87 (January 2015).

    https://doi.org/10.1016/j.enbuild.2014.11.062

  12. Lee, Seulbi / Park, Moonseo / Lee, Hyun-Soo / Ham, Youngjib (2020): Impact of Demand-Side Response on Community Resilience: Focusing on a Power Grid after Seismic Hazards. In: Journal of Management in Engineering (ASCE), v. 36, n. 6 (November 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000844

  13. Cho, Jongwoo / Lee, Hyun-Soo / Park, Moonseo / Song, Kwonsik / Kim, Jaegon / Kwon, Nahyun (2020): Estimating the Performance of Heavy Impact Sound Insulation Using Empirical Approaches. In: Journal of Asian Architecture and Building Engineering, v. 20, n. 3 (October 2020).

    https://doi.org/10.1080/13467581.2020.1786390

  14. Jang, Youjin / Kwon, Nahyun / Ahn, Yonghan / Lee, Hyun-Soo / Park, Moonseo (2019): International Diversification and Performance of Construction Companies: Moderating Effect of Regional, Product, and Industry Diversifications. In: Journal of Management in Engineering (ASCE), v. 35, n. 5 (September 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000713

  15. Lee, Kwang-Pyo / Lee, Hyun-Soo / Park, Moonseo / Kim, Du Yon / Jung, Minhyuk (2017): Management-Reserve Estimation for International Construction Projects Based on Risk-Informed k-NN. In: Journal of Management in Engineering (ASCE), v. 33, n. 4 (July 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000510

  16. Park, Moonseo / Nepal, Madhav Prasad / Dulaimi, Mohammed Fadhil (2004): Dynamic Modeling for Construction Innovation. In: Journal of Management in Engineering (ASCE), v. 20, n. 4 (October 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:4(170)

  17. Park, Moonseo / Chu, Yongsik / Lee, Hyun-Soo / Kim, Wooyoung (2009): Evaluation Methods for Construction Projects. In: Journal of Civil Engineering and Management, v. 15, n. 4 (December 2009).

    https://doi.org/10.3846/1392-3730.2009.15.349-359

  18. Jung, Minhyuk / Park, Moonseo / Lee, Hyun-Soo / Chi, Seokho (2018): Multimethod Supply Chain Simulation Model for High-Rise Building Construction Projects. In: Journal of Computing in Civil Engineering, v. 32, n. 3 (May 2018).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000751

  19. Ji, Sae-Hyun / Park, Moonseo / Lee, Hyun-Soo / Ahn, Joseph / Kim, Namho / Son, Bosik (2011): Military Facility Cost Estimation System Using Case-Based Reasoning in Korea. In: Journal of Computing in Civil Engineering, v. 25, n. 3 (May 2011).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000082

  20. Kim, Hyunsoo / Lee, Hyun-Soo / Park, Moonseo / Chung, BooYoung / Hwang, Sungjoo (2015): Information Retrieval Framework for Hazard Identification in Construction. In: Journal of Computing in Civil Engineering, v. 29, n. 3 (May 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000340

  21. Peña-Mora, Feniosky / Park, Moonseo (2001): Dynamic Planning for Fast-Tracking Building Construction Projects. In: Journal of Construction Engineering and Management, v. 127, n. 6 (December 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:6(445)

  22. Lee, Bogyeong / Lee, Hyun-Soo / Park, Moonseo / Kim, Hyunsoo (2015): Influence Factors of Learning-Curve Effect in High-Rise Building Constructions. In: Journal of Construction Engineering and Management, v. 141, n. 8 (August 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000997

  23. Park, Moonseo / Yang, Youngjun / Lee, Hyun-Soo / Han, Sangwon / Ji, Sae-Hyun (2012): Floor-Level Construction Material Layout Planning Model Considering Actual Travel Path. In: Journal of Construction Engineering and Management, v. 138, n. 7 (July 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000493

  24. Park, Moonseo / Ha, Sungbong / Lee, Hyun-Soo / Choi, Yoon-ki / Kim, Hyunsoo / Han, Sangwon (2013): Lifting demand-based zoning for minimizing worker vertical transportation time in high-rise building construction. In: Automation in Construction, v. 32 (July 2013).

    https://doi.org/10.1016/j.autcon.2013.01.010

  25. Park, Moonseo (2005): Model-based dynamic resource management for construction projects. In: Automation in Construction, v. 14, n. 5 (October 2005).

    https://doi.org/10.1016/j.autcon.2004.11.001

  26. Lee, Sang Hyun / Peña-Mora, Feniosky / Park, Moonseo (2006): Dynamic planning and control methodology for strategic and operational construction project management. In: Automation in Construction, v. 15, n. 1 (January 2006).

    https://doi.org/10.1016/j.autcon.2005.02.008

  27. Choi, Byungjoo / Lee, Hyun-Soo / Park, Moonseo / Cho, Yong K. / Kim, Hyunsoo (2014): Framework for Work-Space Planning Using Four-Dimensional BIM in Construction Projects. In: Journal of Construction Engineering and Management, v. 140, n. 9 (September 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000885

  28. Nepal, Madhav Prasad / Park, Moonseo / Son, Bosik (2006): Effects of Schedule Pressure on Construction Performance. In: Journal of Construction Engineering and Management, v. 132, n. 2 (February 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:2(182)

  29. Dulaimi, Mohammed Fadhil / Nepal, Madhav Prasad / Park, Moonseo (2005): A hierarchical structural model of assessing innovation and project performance. In: Construction Management and Economics, v. 23, n. 6 (July 2005).

    https://doi.org/10.1080/01446190500126684

  30. Hwang, Sungjoo / Park, Moonseo / Lee, Hyun-Soo / Lee, SangHyun (2016): Hybrid Simulation Framework for Immediate Facility Restoration Planning after a Catastrophic Disaster. In: Journal of Construction Engineering and Management, v. 142, n. 8 (August 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001146

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine