Early-stage cost estimation model for power generation project with limited historical data
Author(s): |
Jin Gang Lee
Hyun-Soo Lee Moonseo Park JoonOh Seo |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management, July 2021, n. 7, v. 29 |
Page(s): | 2599-2614 |
DOI: | 10.1108/ecam-04-2020-0261 |
- About this
data sheet - Reference-ID
10614006 - Published on:
09/07/2021 - Last updated on:
13/08/2022