- Performance Barriers for Coordination of Health and Safety during the Preconstruction Phase of Construction Projects. In: Journal of Construction Engineering and Management, v. 149, n. 7 (July 2023). (2023):
- An Analysis of the Demarcation of Construction Projects for Dispute Resolution by Adjudication. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 14, n. 2 (May 2022). (2022):
- The design coordination role at the pre-construction stage of construction projects. In: Building Research & Information, v. 50, n. 4 (December 2021). (2021):
- Construction Law Graduate Studies around the World. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 1, n. 2 (May 2009). (2009):
- Differing site conditions risks: a FIDIC/engineering and construction contract comparison. In: Engineering, Construction and Architectural Management, v. 6, n. 2 (February 1999). (1999):
- Disputing the existence of a dispute as a strategy for avoiding construction adjudication. In: Engineering, Construction and Architectural Management, v. 13, n. 4 (July 2006). (2006):
- The project insurance option in infrastructure procurement. In: Engineering, Construction and Architectural Management, v. 20, n. 3 (April 2013). (2013):
- Best Practice in the Training, Appointment, and Remuneration of Members of Dispute Boards for Large Infrastructure Projects. In: Journal of Management in Engineering (ASCE), v. 30, n. 2 (March 2014). (2014):
- Improving Management of Claims: Contractors' Perspective. In: Journal of Management in Engineering (ASCE), v. 13, n. 5 (September 1997). (1997):
- Role of simulation in construction management. Possible applications of simulation examined in relation to construction management. In: Building Research & Information, v. 20, n. 2 ( 1992). (1992):
- Building Procurement by Design and Build Approach. In: Journal of Construction Engineering and Management, v. 120, n. 2 (June 1994). (1994):
- Performance Bonds and Guarantees: Construction Owners and Professionals Beware. In: Journal of Construction Engineering and Management, v. 125, n. 6 (December 1999). (1999):
- Consultants' Perceptions on Construction Delay Analysis Methodologies. In: Journal of Construction Engineering and Management, v. 135, n. 12 (December 2009). (2009):
- Delay Analysis within Construction Contracting Organizations. In: Journal of Construction Engineering and Management, v. 134, n. 9 (September 2008). (2008):
- Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. In: Construction Management and Economics, v. 23, n. 4 (May 2005). (2005):
- Improving the management of claims on construction contracts: consultant's perspective. In: Construction Management and Economics, v. 16, n. 3 (May 1998). (1998):
- The engineer under FIDIC's conditions of contract for construction. In: Construction Management and Economics, v. 25, n. 7 (July 2007). (2007):