0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Issaka Ndekugri ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Ndekugri, Issaka / Ankrah, Nii A. / Adaku, Ebenezer (2023): Performance Barriers for Coordination of Health and Safety during the Preconstruction Phase of Construction Projects. Dans: Journal of Construction Engineering and Management, v. 149, n. 7 (juillet 2023).

    https://doi.org/10.1061/jcemd4.coeng-12073

  2. Ndekugri, Issaka / Gyoh, Louis / Ankrah, Nii (2022): An Analysis of the Demarcation of Construction Projects for Dispute Resolution by Adjudication. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 14, n. 2 (mai 2022).

    https://doi.org/10.1061/(asce)la.1943-4170.0000536

  3. Ndekugri, Issaka / Ankrah, Nii A. / Adaku, Ebenezer (2021): The design coordination role at the pre-construction stage of construction projects. Dans: Building Research & Information, v. 50, n. 4 (décembre 2021).

    https://doi.org/10.1080/09613218.2021.1971061

  4. Bell, Matthew / Gerber, Paula / Evans, Phil / Kirsh, Harvey J. / Barrington, Louise / Britton, Philip / Green, Martin / McAdam, Brodie / Davenport, Dierdre / Ndekugri, Issaka / Frilet, Marc / Chan, Edwin H. / Chao-Duivis, Monika / Auchie, Derek P. / Chan, Philip / Sklar, Stanley P. (2009): Construction Law Graduate Studies around the World. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 1, n. 2 (mai 2009).

    https://doi.org/10.1061/(asce)1943-4162(2009)1:2(70)

  5. Ndekugri, Issaka / McDonnell, Barry (1999): Differing site conditions risks: a FIDIC/engineering and construction contract comparison. Dans: Engineering, Construction and Architectural Management, v. 6, n. 2 (février 1999).

    https://doi.org/10.1108/eb021110

  6. Ndekugri, Issaka / Russell, Victoria (2006): Disputing the existence of a dispute as a strategy for avoiding construction adjudication. Dans: Engineering, Construction and Architectural Management, v. 13, n. 4 (juillet 2006).

    https://doi.org/10.1108/09699980610680180

  7. Ndekugri, Issaka / Daeche, Hannah / Zhou, Diwei (2013): The project insurance option in infrastructure procurement. Dans: Engineering, Construction and Architectural Management, v. 20, n. 3 (avril 2013).

    https://doi.org/10.1108/09699981311324005

  8. Ndekugri, Issaka / Chapman, Peter / Smith, Nigel / Hughes, Will (2014): Best Practice in the Training, Appointment, and Remuneration of Members of Dispute Boards for Large Infrastructure Projects. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 2 (mars 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000195

  9. Vidogah, William / Ndekugri, Issaka (1997): Improving Management of Claims: Contractors' Perspective. Dans: Journal of Management in Engineering (ASCE), v. 13, n. 5 (septembre 1997).

    https://doi.org/10.1061/(asce)0742-597x(1997)13:5(37)

  10. Ndekugri, Issaka / Lansley, Peter (1992): Role of simulation in construction management. Possible applications of simulation examined in relation to construction management. Dans: Building Research & Information, v. 20, n. 2 ( 1992).

    https://doi.org/10.1080/09613219208727186

  11. Ndekugri, Issaka / Turner, Adrian (1994): Building Procurement by Design and Build Approach. Dans: Journal of Construction Engineering and Management, v. 120, n. 2 (juin 1994).

    https://doi.org/10.1061/(asce)0733-9364(1994)120:2(243)

  12. Ndekugri, Issaka (1999): Performance Bonds and Guarantees: Construction Owners and Professionals Beware. Dans: Journal of Construction Engineering and Management, v. 125, n. 6 (décembre 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:6(428)

  13. Braimah, Nuhu / Ndekugri, Issaka (2009): Consultants' Perceptions on Construction Delay Analysis Methodologies. Dans: Journal of Construction Engineering and Management, v. 135, n. 12 (décembre 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000096

  14. Ndekugri, Issaka / Braimah, Nuhu / Gameson, Rod (2008): Delay Analysis within Construction Contracting Organizations. Dans: Journal of Construction Engineering and Management, v. 134, n. 9 (septembre 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:9(692)

  15. Ndekugri, Issaka / Russell, Victoria (2005): Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Dans: Construction Management and Economics, v. 23, n. 4 (mai 2005).

    https://doi.org/10.1080/0144619042000326747

  16. Vidogah, William / Ndekugri, Issaka (1998): Improving the management of claims on construction contracts: consultant's perspective. Dans: Construction Management and Economics, v. 16, n. 3 (mai 1998).

    https://doi.org/10.1080/014461998372385

  17. Ndekugri, Issaka / Smith, Nigel / Hughes, Will (2007): The engineer under FIDIC's conditions of contract for construction. Dans: Construction Management and Economics, v. 25, n. 7 (juillet 2007).

    https://doi.org/10.1080/01446190701411216

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine