0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Ottaviani, Filippo Maria / De Marco, Alberto / Narbaev, Timur / Rebuglio, Massimo (2024): Improving Project Estimates at Completion through Progress-Based Performance Factors. In: Buildings, v. 14, n. 3 (21 February 2024).

    https://doi.org/10.3390/buildings14030643

  2. Osei-Kyei, Robert / Narbaev, Timur / Ampratwum, Godslove (2022): A Scientometric Analysis of Studies on Risk Management in Construction Projects. In: Buildings, v. 12, n. 9 (16 September 2022).

    https://doi.org/10.3390/buildings12091342

  3. Osei-Kyei, Robert / Narbaev, Timur / Atafo-Adabre, Michael / Chileshe, Nicholas / Ofori-Kuragu, Joseph Kwame (2022): Critical success criteria for retirement village public – private partnership housing. In: Construction Innovation, v. 23, n. 5 (August 2022).

    https://doi.org/10.1108/ci-11-2021-0206

  4. Narbaev, Timur / Hazır, Öncü / Agi, Maher (2022): A Review of the Use of Game Theory in Project Management. In: Journal of Management in Engineering (ASCE), v. 38, n. 6 (November 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001092

  5. De Marco, Alberto / Narbaev, Timur (2021): Factors of Schedule and Cost Performance of Tunnel Construction Megaprojects. In: The Open Civil Engineering Journal, v. 15, n. 1 (22 February 2021).

    https://doi.org/10.2174/1874149502115010038

  6. De Marco, Alberto / Mangano, Giulio / Narbaev, Timur (2017): The influence of risk on the equity share of build-operate-transfer projects. In: Built Environment Project and Asset Management, v. 7, n. 1 (February 2017).

    https://doi.org/10.1108/bepam-02-2016-0003

  7. Narbaev, Timur / De Marco, Alberto / Orazalin, Nurlan (2019): A multi-disciplinary meta-review of the public–private partnerships research. In: Construction Management and Economics, v. 38, n. 2 (May 2019).

    https://doi.org/10.1080/01446193.2019.1643033

  8. Narbaev, Timur / De Marco, Alberto (2014): Combination of Growth Model and Earned Schedule to Forecast Project Cost at Completion. In: Journal of Construction Engineering and Management, v. 140, n. 1 (January 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000783

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine