Stuart Moore
- (2024): Structural Assessment of the M6 Bromford Viaduct Against Ground Movements. Presented at: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024.
- Strengthening of the Hammersmith Flyover, London (Phase 2) – design of the prestress. In: The Structural Engineer, v. 95, n. 8 (August 2017). (2017):
- (2016): Hammersmith Flyover – Strengthening of a Prestressed Segmental Bridge. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.