Stuart Moore
- (2024): Structural Assessment of the M6 Bromford Viaduct Against Ground Movements. Présenté pendant: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024.
- Strengthening of the Hammersmith Flyover, London (Phase 2) – design of the prestress. Dans: The Structural Engineer, v. 95, n. 8 (août 2017). (2017):
- (2016): Hammersmith Flyover – Strengthening of a Prestressed Segmental Bridge. Présenté pendant: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.