Sungwoo Moon
- Comparative feasibility study of physiological signals from wristband-type wearable sensors to assess occupants' thermal comfort. In: Energy and Buildings, v. 308 (April 2024). (2024):
- Generating integrated bill of materials using mask R-CNN artificial intelligence model. In: Automation in Construction, v. 145 (January 2023). (2023):
- Artificial intelligence quality inspection of steel bars installation by integrating mask R-CNN and stereo vision. In: Automation in Construction, v. 130 (October 2021). (2021):
- Utilization of Prior Information in Neural Network Training for Improving 28-Day Concrete Strength Prediction. In: Journal of Construction Engineering and Management, v. 147, n. 5 (May 2021). (2021):
- Stochastic Revenue and Cost Model for Determining a BOT Concession Period under Multiple Project Constraints. In: Journal of Management in Engineering (ASCE), v. 30, n. 3 (May 2014). (2014):
- Stochastic Forecast of Construction Cost Index Using a Cointegrated Vector Autoregression Model. In: Journal of Management in Engineering (ASCE), v. 29, n. 1 (January 2013). (2013):
- Virtual Graphic Representation of Construction Equipment for Developing A 3d Earthwork Bim. In: Journal of Civil Engineering and Management, v. 23, n. 8 (November 2017). (2017):
- Prototyping a remotely-controlled machine for concrete surface grinding operations. In: Journal of Civil Engineering and Management, v. 23, n. 2 (February 2017). (2017):
- Vision-Based Interactive Path Planning for Robotic Bridge Paint Removal. In: Journal of Computing in Civil Engineering, v. 11, n. 2 (April 1997). (1997):
- USN-Based Data Acquisition for Increasing Safety in the Concrete Formwork Operation. In: Journal of Computing in Civil Engineering, v. 26, n. 3 (May 2012). (2012):
- Effective Monitoring of the Concrete Pouring Operation in an RFID-Based Environment. In: Journal of Computing in Civil Engineering, v. 24, n. 1 (January 2010). (2010):
- Utilization of contradiction for creating design alternatives in construction value engineering. In: KSCE Journal of Civil Engineering, v. 18, n. 2 (January 2014). (2014):
- Graphic-Based Human-Machine Interface for Construction Manipulator Control. In: Journal of Construction Engineering and Management, v. 124, n. 4 (July 1998). (1998):
- Structured Idea Creation for Improving the Value of Construction Design. In: Journal of Construction Engineering and Management, v. 138, n. 7 (July 2012). (2012):
- Creation of Robust Design Alternatives for Temporary Construction in Value Engineering. In: Journal of Construction Engineering and Management, v. 142, n. 3 (March 2016). (2016):
- Effectiveness of remote control for a concrete surface grinding machine. In: Automation in Construction, v. 19, n. 6 (October 2010). (2010):
- Hierarchical evaluation of on-site environmental performance to enhance a green construction operation. In: Civil Engineering and Environmental Systems, v. 31, n. 1 (January 2014). (2014):
- Holistic integration based on USN technology for monitoring safety during concrete placement. In: Automation in Construction, v. 57 (September 2015). (2015):
- Determination of the Optimal Concession Period for BOT Contract Projects Based on a Discrete Stochastic Process Model. In: Journal of Construction Engineering and Management, v. 143, n. 4 (April 2017). (2017):
- Safety Guideline for Safe Concrete Placement Utilizing the Information on the Structural Behavior of Formwork. In: Journal of Construction Engineering and Management, v. 144, n. 12 (December 2018). (2018):