Sungwoo Moon
- Comparative feasibility study of physiological signals from wristband-type wearable sensors to assess occupants' thermal comfort. Dans: Energy and Buildings, v. 308 (avril 2024). (2024):
- Generating integrated bill of materials using mask R-CNN artificial intelligence model. Dans: Automation in Construction, v. 145 (janvier 2023). (2023):
- Artificial intelligence quality inspection of steel bars installation by integrating mask R-CNN and stereo vision. Dans: Automation in Construction, v. 130 (octobre 2021). (2021):
- Utilization of Prior Information in Neural Network Training for Improving 28-Day Concrete Strength Prediction. Dans: Journal of Construction Engineering and Management, v. 147, n. 5 (mai 2021). (2021):
- Stochastic Revenue and Cost Model for Determining a BOT Concession Period under Multiple Project Constraints. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 3 (mai 2014). (2014):
- Stochastic Forecast of Construction Cost Index Using a Cointegrated Vector Autoregression Model. Dans: Journal of Management in Engineering (ASCE), v. 29, n. 1 (janvier 2013). (2013):
- Virtual Graphic Representation of Construction Equipment for Developing A 3d Earthwork Bim. Dans: Journal of Civil Engineering and Management, v. 23, n. 8 (novembre 2017). (2017):
- Prototyping a remotely-controlled machine for concrete surface grinding operations. Dans: Journal of Civil Engineering and Management, v. 23, n. 2 (février 2017). (2017):
- Vision-Based Interactive Path Planning for Robotic Bridge Paint Removal. Dans: Journal of Computing in Civil Engineering, v. 11, n. 2 (avril 1997). (1997):
- USN-Based Data Acquisition for Increasing Safety in the Concrete Formwork Operation. Dans: Journal of Computing in Civil Engineering, v. 26, n. 3 (mai 2012). (2012):
- Effective Monitoring of the Concrete Pouring Operation in an RFID-Based Environment. Dans: Journal of Computing in Civil Engineering, v. 24, n. 1 (janvier 2010). (2010):
- Utilization of contradiction for creating design alternatives in construction value engineering. Dans: KSCE Journal of Civil Engineering, v. 18, n. 2 (janvier 2014). (2014):
- Graphic-Based Human-Machine Interface for Construction Manipulator Control. Dans: Journal of Construction Engineering and Management, v. 124, n. 4 (juillet 1998). (1998):
- Structured Idea Creation for Improving the Value of Construction Design. Dans: Journal of Construction Engineering and Management, v. 138, n. 7 (juillet 2012). (2012):
- Creation of Robust Design Alternatives for Temporary Construction in Value Engineering. Dans: Journal of Construction Engineering and Management, v. 142, n. 3 (mars 2016). (2016):
- Effectiveness of remote control for a concrete surface grinding machine. Dans: Automation in Construction, v. 19, n. 6 (octobre 2010). (2010):
- Hierarchical evaluation of on-site environmental performance to enhance a green construction operation. Dans: Civil Engineering and Environmental Systems, v. 31, n. 1 (janvier 2014). (2014):
- Holistic integration based on USN technology for monitoring safety during concrete placement. Dans: Automation in Construction, v. 57 (septembre 2015). (2015):
- Determination of the Optimal Concession Period for BOT Contract Projects Based on a Discrete Stochastic Process Model. Dans: Journal of Construction Engineering and Management, v. 143, n. 4 (avril 2017). (2017):
- Safety Guideline for Safe Concrete Placement Utilizing the Information on the Structural Behavior of Formwork. Dans: Journal of Construction Engineering and Management, v. 144, n. 12 (décembre 2018). (2018):