-
Montalbán-Domingo, Laura / Torres-Machi, Cristina / Sanz-Benlloch, Amalia / Pellicer, Eugenio / Molenaar, Keith R. (2023): Green Public Procurement in Civil Infrastructure Construction: Current Performance and Main Project Characteristics. In: Journal of Construction Engineering and Management, v. 149, n. 9 (September 2023).
https://doi.org/10.1061/jcemd4.coeng-13502
-
Gaikwad, Suraj V. / Calahorra-Jimenez, Maria / Molenaar, Keith R. / Torres-Machi, Cristina (2021): Challenges in Engineering Estimates for Best Value Design–Build Highway Projects. In: Journal of Construction Engineering and Management, v. 147, n. 7 (July 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002104
-
Alleman, Douglas / Stanford, M. Scott / Papajohn, Dean / Jobidon, Gabriel / Molenaar, Keith R. (2020): Characteristics of Stipends and Their Value-Adding Potential in Design-Build US Highway Construction. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 2 (May 2020).
https://doi.org/10.1061/(asce)la.1943-4170.0000388
-
Gransberg, Douglas D. / Molenaar, Keith R. (2004): Life-Cycle Cost Award Algorithms for Design/Build Highway Pavement Projects. In: Journal of Infrastructure Systems, v. 10, n. 4 (December 2004).
https://doi.org/10.1061/(asce)1076-0342(2004)10:4(167)
-
Tran, Dai Q. / Molenaar, Keith R. / Alarcon, Luis F. (2016): A Hybrid Cross-Impact Approach to Predicting Cost Variance of Project Delivery Decisions for Highways. In: Journal of Infrastructure Systems, v. 22, n. 1 (March 2016).
https://doi.org/10.1061/(asce)is.1943-555x.0000270
-
Tran, Dai Q. / Molenaar, Keith R. (2014): Exploring critical delivery selection risk factors for transportation design and construction projects. In: Engineering, Construction and Architectural Management, v. 21, n. 6 (November 2014).
https://doi.org/10.1108/ecam-11-2013-0103
-
Tran, Dai Q. / Molenaar, Keith R. / Kolli, Bharath (2017): Implementation of best-value procurement for highway design and construction in the USA. In: Engineering, Construction and Architectural Management, v. 24, n. 5 (September 2017).
https://doi.org/10.1108/ecam-03-2016-0073
-
Beitelmal, Wesam / Molenaar, Keith R. / Javernick-Will, Amy / Pellicer, Eugenio (2017): Challenges and barriers to establishing infrastructure asset management. A comparative study between Libya and the USA. In: Engineering, Construction and Architectural Management, v. 24, n. 6 (November 2017).
https://doi.org/10.1108/ecam-12-2015-0200
-
Stanford, M. Scott / Molenaar, Keith R. (2020): Cost Implications of Indefinite Delivery–Indefinite Quantity Contracting in the US Defense Sector. In: Journal of Management in Engineering (ASCE), v. 36, n. 5 (September 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000827
-
Papajohn, Dean / El Asmar, Mounir / Molenaar, Keith R. / Alleman, Doug (2020): Comparing Contract Administration Functions for Alternative and Traditional Delivery of Highway Projects. In: Journal of Management in Engineering (ASCE), v. 36, n. 1 (January 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000727
-
Papajohn, Dean / El Asmar, Mounir / Molenaar, Keith R. (2019): Contract Administration Tools for Design-Build and Construction Manager/General Contractor Highway Projects. In: Journal of Management in Engineering (ASCE), v. 35, n. 6 (November 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000718
-
Antoine, Arthur L. C. / Alleman, Douglas / Molenaar, Keith R. (2019): Examination of Project Duration, Project Intensity, and Timing of Cost Certainty in Highway Project Delivery Methods. In: Journal of Management in Engineering (ASCE), v. 35, n. 1 (January 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000661
-
Antillon, Eric I. / Garvin, Michael J. / Molenaar, Keith R. / Javernick-Will, Amy (2018): Influence of Interorganizational Coordination on Lifecycle Design Decision Making: Comparative Case Study of Public–Private Partnership Highway Projects. In: Journal of Management in Engineering (ASCE), v. 34, n. 5 (September 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000623
-
Pellicer, Eugenio / Amalia Sanz, M. / Esmaeili, Behzad / Molenaar, Keith R. (2016): Exploration of Team Integration in Spanish Multifamily Residential Building Construction. In: Journal of Management in Engineering (ASCE), v. 32, n. 5 (September 2016).
https://doi.org/10.1061/(asce)me.1943-5479.0000438
-
Stanford, M. Scott / Molenaar, Keith R. / Sheeran, Kelly M. (2016): Application of Indefinite Delivery–Indefinite Quantity Construction Strategies at the Federal Level. In: Journal of Management in Engineering (ASCE), v. 32, n. 5 (September 2016).
https://doi.org/10.1061/(asce)me.1943-5479.0000437
-
Tran, Dai Q. / Hallowell, Matthew R. / Molenaar, Keith R. (2015): Construction Management Challenges and Best Practices for Rural Transit Projects. In: Journal of Management in Engineering (ASCE), v. 31, n. 5 (September 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000297
-
Tran, Dai Q. / Molenaar, Keith R. (2014): Impact of Risk on Design-Build Selection for Highway Design and Construction Projects. In: Journal of Management in Engineering (ASCE), v. 30, n. 2 (March 2014).
https://doi.org/10.1061/(asce)me.1943-5479.0000210
-
Molenaar, Keith R. / Javernick-Will, Amy / Bastias, Alfonso G. / Wardwell, Meredith A. / Saller, Kevin (2013): Construction Project Peer Reviews as an Early Indicator of Project Success. In: Journal of Management in Engineering (ASCE), v. 29, n. 4 (October 2013).
https://doi.org/10.1061/(asce)me.1943-5479.0000149
-
Hallowell, Matthew R. / Molenaar, Keith R. / Fortunato, Bernard R. (2013): Enterprise Risk Management Strategies for State Departments of Transportation. In: Journal of Management in Engineering (ASCE), v. 29, n. 2 (April 2013).
https://doi.org/10.1061/(asce)me.1943-5479.0000136
-
Shane, Jennifer S. / Molenaar, Keith R. / Anderson, Stuart / Schexnayder, Cliff (2009): Construction Project Cost Escalation Factors. In: Journal of Management in Engineering (ASCE), v. 25, n. 4 (October 2009).
https://doi.org/10.1061/(asce)0742-597x(2009)25:4(221)
-
Molenaar, Keith R. / Bogus, Susan M. / Priestley, Jenny M. (2004): Design/Build for Water/Wastewater Facilities: State of the Industry Survey and Three Case Studies. In: Journal of Management in Engineering (ASCE), v. 20, n. 1 (January 2004).
https://doi.org/10.1061/(asce)0742-597x(2004)20:1(16)
-
Molenaar, Keith R. / Gransberg, Douglas D. (2001): Design-Builder Selection for Small Highway Projects. In: Journal of Management in Engineering (ASCE), v. 17, n. 4 (October 2001).
https://doi.org/10.1061/(asce)0742-597x(2001)17:4(214)
-
Molenaar, Keith R. / Saller, Brian J. (2003): Educational Needs Assessment for Design/Build Project Delivery. In: Journal of Professional Issues in Engineering Education and Practice, v. 129, n. 2 (April 2003).
https://doi.org/10.1061/(asce)1052-3928(2003)129:2(106)
-
Shane, Jennifer S. / Gransberg, Douglas D. / Molenaar, Keith R. / Gladke, Joseph R. (2006): Legal Challenge to a Best-Value Procurement System. In: Leadership and Management in Engineering (ASCE), v. 6, n. 1 (January 2006).
https://doi.org/10.1061/(asce)1532-6748(2006)6:1(20)
-
Molenaar, Keith R. / Johnson, Douglas E. (2003): Engineering the Procurement Phase to Achieve Best Value. In: Leadership and Management in Engineering (ASCE), v. 3, n. 3 (July 2003).
https://doi.org/10.1061/(asce)1532-6748(2003)3:3(137)
-
Apipattanavis, Somkiat / Sabol, Kevin / Molenaar, Keith R. / Rajagopalan, Balaji / Xi, Yunping / Blackard, Ben / Patil, Shekhar (2010): Integrated Framework for Quantifying and Predicting Weather-Related Highway Construction Delays. In: Journal of Construction Engineering and Management, v. 136, n. 11 (November 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000199
-
Molenaar, Keith R. / Park, Jeong-Il / Washington, Simon (2009): Framework for Measuring Corporate Safety Culture and Its Impact on Construction Safety Performance. In: Journal of Construction Engineering and Management, v. 135, n. 6 (June 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:6(488)
-
Bogus, Susan M. / Molenaar, Keith R. / Diekmann, James E. (2005): Concurrent Engineering Approach to Reducing Design Delivery Time. In: Journal of Construction Engineering and Management, v. 131, n. 11 (November 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:11(1179)
-
Antillon, Eric I. / Molenaar, Keith R. / Javernick-Will, Amy (2017): Evaluating the Effect of Contract Timing on Lifecycle-Design Innovation in Public–Private Partnerships: Comparative Case Study of Highway Projects. In: Journal of Construction Engineering and Management, v. 143, n. 4 (April 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001239
-
Stanford, M. Scott / Molenaar, Keith R. (2018): Influence of Simplified Procurement Methods on Competition for Public Sector Construction. In: Journal of Construction Engineering and Management, v. 144, n. 2 (February 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001419