0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Keith R. Molenaar ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Montalbán-Domingo, Laura / Torres-Machi, Cristina / Sanz-Benlloch, Amalia / Pellicer, Eugenio / Molenaar, Keith R. (2023): Green Public Procurement in Civil Infrastructure Construction: Current Performance and Main Project Characteristics. Dans: Journal of Construction Engineering and Management, v. 149, n. 9 (septembre 2023).

    https://doi.org/10.1061/jcemd4.coeng-13502

  2. Gaikwad, Suraj V. / Calahorra-Jimenez, Maria / Molenaar, Keith R. / Torres-Machi, Cristina (2021): Challenges in Engineering Estimates for Best Value Design–Build Highway Projects. Dans: Journal of Construction Engineering and Management, v. 147, n. 7 (juillet 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002104

  3. Alleman, Douglas / Stanford, M. Scott / Papajohn, Dean / Jobidon, Gabriel / Molenaar, Keith R. (2020): Characteristics of Stipends and Their Value-Adding Potential in Design-Build US Highway Construction. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 2 (mai 2020).

    https://doi.org/10.1061/(asce)la.1943-4170.0000388

  4. Gransberg, Douglas D. / Molenaar, Keith R. (2004): Life-Cycle Cost Award Algorithms for Design/Build Highway Pavement Projects. Dans: Journal of Infrastructure Systems, v. 10, n. 4 (décembre 2004).

    https://doi.org/10.1061/(asce)1076-0342(2004)10:4(167)

  5. Tran, Dai Q. / Molenaar, Keith R. / Alarcon, Luis F. (2016): A Hybrid Cross-Impact Approach to Predicting Cost Variance of Project Delivery Decisions for Highways. Dans: Journal of Infrastructure Systems, v. 22, n. 1 (mars 2016).

    https://doi.org/10.1061/(asce)is.1943-555x.0000270

  6. Tran, Dai Q. / Molenaar, Keith R. (2014): Exploring critical delivery selection risk factors for transportation design and construction projects. Dans: Engineering, Construction and Architectural Management, v. 21, n. 6 (novembre 2014).

    https://doi.org/10.1108/ecam-11-2013-0103

  7. Tran, Dai Q. / Molenaar, Keith R. / Kolli, Bharath (2017): Implementation of best-value procurement for highway design and construction in the USA. Dans: Engineering, Construction and Architectural Management, v. 24, n. 5 (septembre 2017).

    https://doi.org/10.1108/ecam-03-2016-0073

  8. Beitelmal, Wesam / Molenaar, Keith R. / Javernick-Will, Amy / Pellicer, Eugenio (2017): Challenges and barriers to establishing infrastructure asset management. A comparative study between Libya and the USA. Dans: Engineering, Construction and Architectural Management, v. 24, n. 6 (novembre 2017).

    https://doi.org/10.1108/ecam-12-2015-0200

  9. Stanford, M. Scott / Molenaar, Keith R. (2020): Cost Implications of Indefinite Delivery–Indefinite Quantity Contracting in the US Defense Sector. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 5 (septembre 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000827

  10. Papajohn, Dean / El Asmar, Mounir / Molenaar, Keith R. / Alleman, Doug (2020): Comparing Contract Administration Functions for Alternative and Traditional Delivery of Highway Projects. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 1 (janvier 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000727

  11. Papajohn, Dean / El Asmar, Mounir / Molenaar, Keith R. (2019): Contract Administration Tools for Design-Build and Construction Manager/General Contractor Highway Projects. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 6 (novembre 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000718

  12. Antoine, Arthur L. C. / Alleman, Douglas / Molenaar, Keith R. (2019): Examination of Project Duration, Project Intensity, and Timing of Cost Certainty in Highway Project Delivery Methods. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 1 (janvier 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000661

  13. Antillon, Eric I. / Garvin, Michael J. / Molenaar, Keith R. / Javernick-Will, Amy (2018): Influence of Interorganizational Coordination on Lifecycle Design Decision Making: Comparative Case Study of Public–Private Partnership Highway Projects. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 5 (septembre 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000623

  14. Pellicer, Eugenio / Amalia Sanz, M. / Esmaeili, Behzad / Molenaar, Keith R. (2016): Exploration of Team Integration in Spanish Multifamily Residential Building Construction. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 5 (septembre 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000438

  15. Stanford, M. Scott / Molenaar, Keith R. / Sheeran, Kelly M. (2016): Application of Indefinite Delivery–Indefinite Quantity Construction Strategies at the Federal Level. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 5 (septembre 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000437

  16. Tran, Dai Q. / Hallowell, Matthew R. / Molenaar, Keith R. (2015): Construction Management Challenges and Best Practices for Rural Transit Projects. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 5 (septembre 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000297

  17. Tran, Dai Q. / Molenaar, Keith R. (2014): Impact of Risk on Design-Build Selection for Highway Design and Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 2 (mars 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000210

  18. Molenaar, Keith R. / Javernick-Will, Amy / Bastias, Alfonso G. / Wardwell, Meredith A. / Saller, Kevin (2013): Construction Project Peer Reviews as an Early Indicator of Project Success. Dans: Journal of Management in Engineering (ASCE), v. 29, n. 4 (octobre 2013).

    https://doi.org/10.1061/(asce)me.1943-5479.0000149

  19. Hallowell, Matthew R. / Molenaar, Keith R. / Fortunato, Bernard R. (2013): Enterprise Risk Management Strategies for State Departments of Transportation. Dans: Journal of Management in Engineering (ASCE), v. 29, n. 2 (avril 2013).

    https://doi.org/10.1061/(asce)me.1943-5479.0000136

  20. Shane, Jennifer S. / Molenaar, Keith R. / Anderson, Stuart / Schexnayder, Cliff (2009): Construction Project Cost Escalation Factors. Dans: Journal of Management in Engineering (ASCE), v. 25, n. 4 (octobre 2009).

    https://doi.org/10.1061/(asce)0742-597x(2009)25:4(221)

  21. Molenaar, Keith R. / Bogus, Susan M. / Priestley, Jenny M. (2004): Design/Build for Water/Wastewater Facilities: State of the Industry Survey and Three Case Studies. Dans: Journal of Management in Engineering (ASCE), v. 20, n. 1 (janvier 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:1(16)

  22. Molenaar, Keith R. / Gransberg, Douglas D. (2001): Design-Builder Selection for Small Highway Projects. Dans: Journal of Management in Engineering (ASCE), v. 17, n. 4 (octobre 2001).

    https://doi.org/10.1061/(asce)0742-597x(2001)17:4(214)

  23. Molenaar, Keith R. / Saller, Brian J. (2003): Educational Needs Assessment for Design/Build Project Delivery. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 129, n. 2 (avril 2003).

    https://doi.org/10.1061/(asce)1052-3928(2003)129:2(106)

  24. Shane, Jennifer S. / Gransberg, Douglas D. / Molenaar, Keith R. / Gladke, Joseph R. (2006): Legal Challenge to a Best-Value Procurement System. Dans: Leadership and Management in Engineering (ASCE), v. 6, n. 1 (janvier 2006).

    https://doi.org/10.1061/(asce)1532-6748(2006)6:1(20)

  25. Molenaar, Keith R. / Johnson, Douglas E. (2003): Engineering the Procurement Phase to Achieve Best Value. Dans: Leadership and Management in Engineering (ASCE), v. 3, n. 3 (juillet 2003).

    https://doi.org/10.1061/(asce)1532-6748(2003)3:3(137)

  26. Apipattanavis, Somkiat / Sabol, Kevin / Molenaar, Keith R. / Rajagopalan, Balaji / Xi, Yunping / Blackard, Ben / Patil, Shekhar (2010): Integrated Framework for Quantifying and Predicting Weather-Related Highway Construction Delays. Dans: Journal of Construction Engineering and Management, v. 136, n. 11 (novembre 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000199

  27. Molenaar, Keith R. / Park, Jeong-Il / Washington, Simon (2009): Framework for Measuring Corporate Safety Culture and Its Impact on Construction Safety Performance. Dans: Journal of Construction Engineering and Management, v. 135, n. 6 (juin 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:6(488)

  28. Bogus, Susan M. / Molenaar, Keith R. / Diekmann, James E. (2005): Concurrent Engineering Approach to Reducing Design Delivery Time. Dans: Journal of Construction Engineering and Management, v. 131, n. 11 (novembre 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:11(1179)

  29. Antillon, Eric I. / Molenaar, Keith R. / Javernick-Will, Amy (2017): Evaluating the Effect of Contract Timing on Lifecycle-Design Innovation in Public–Private Partnerships: Comparative Case Study of Highway Projects. Dans: Journal of Construction Engineering and Management, v. 143, n. 4 (avril 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001239

  30. Stanford, M. Scott / Molenaar, Keith R. (2018): Influence of Simplified Procurement Methods on Competition for Public Sector Construction. Dans: Journal of Construction Engineering and Management, v. 144, n. 2 (février 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001419

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine