0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Julio C. Martinez

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kamat, Vineet R. / Martinez, Julio C. (2001): Visualizing Simulated Construction Operations in 3D. In: Journal of Computing in Civil Engineering, v. 15, n. 4 (October 2001).

    https://doi.org/10.1061/(asce)0887-3801(2001)15:4(329)

  2. Rekapalli, Prasant V. / Martinez, Julio C. (2009): Runtime User Interaction in Concurrent Simulation-Animations of Construction Operations. In: Journal of Computing in Civil Engineering, v. 23, n. 6 (November 2009).

    https://doi.org/10.1061/(asce)0887-3801(2009)23:6(372)

  3. Kamat, Vineet R. / Martinez, Julio C. (2004): Dynamic Three-Dimensional Visualization of Fluid Construction Materials. In: Journal of Computing in Civil Engineering, v. 18, n. 3 (July 2004).

    https://doi.org/10.1061/(asce)0887-3801(2004)18:3(237)

  4. Kamat, Vineet R. / Martinez, Julio C. (2005): Large-Scale Dynamic Terrain in Three-Dimensional Construction Process Visualizations. In: Journal of Computing in Civil Engineering, v. 19, n. 2 (April 2005).

    https://doi.org/10.1061/(asce)0887-3801(2005)19:2(160)

  5. Kamat, Vineet R. / Martinez, Julio C. (2005): Dynamic 3D Visualization of Articulated Construction Equipment. In: Journal of Computing in Civil Engineering, v. 19, n. 4 (October 2005).

    https://doi.org/10.1061/(asce)0887-3801(2005)19:4(356)

  6. Martinez, Julio C. (2010): Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management. In: Journal of Construction Engineering and Management, v. 136, n. 1 (January 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000087

  7. Martinez, Julio C. / Ioannou, Photios G. (1999): General-Purpose Systems for Effective Construction Simulation. In: Journal of Construction Engineering and Management, v. 125, n. 4 (August 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:4(265)

  8. Ioannou, Photios G. / Martinez, Julio C. (1996): Comparison of Construction Alternatives Using Matched Simulation Experiments. In: Journal of Construction Engineering and Management, v. 122, n. 3 (September 1996).

    https://doi.org/10.1061/(asce)0733-9364(1996)122:3(231)

  9. Rekapalli, Prasant V. / Martinez, Julio C. (2011): Discrete-Event Simulation-Based Virtual Reality Environments for Construction Operations: Technology Introduction. In: Journal of Construction Engineering and Management, v. 137, n. 3 (March 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000270

  10. Kamat, Vineet R. / Martinez, Julio C. / Fischer, Martin / Golparvar-Fard, Mani / Peña-Mora, Feniosky / Savarese, Silvio (2011): Research in Visualization Techniques for Field Construction. In: Journal of Construction Engineering and Management, v. 137, n. 10 (October 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000262

  11. Puri, Vivek / Martinez, Julio C. (2013): Modeling of Simultaneously Continuous and Stochastic Construction Activities for Simulation. In: Journal of Construction Engineering and Management, v. 139, n. 8 (August 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000661

  12. Kamat, Vineet R. / Martinez, Julio C. (2002): Scene Graph and Frame Update Algorithms for Smooth and Scalable 3D Visualization of Simulated Construction Operations. In: Computer-Aided Civil and Infrastructure Engineering, v. 17, n. 4 (July 2002).

    https://doi.org/10.1111/1467-8667.00272

  13. Rekapalli, Prasant V. / Martinez, Julio C. / Kamat, Vineet R. (2009): Algorithm for Accurate Three-Dimensional Scene Graph Updates in High-Speed Animations of Previously Simulated Construction Operations. In: Computer-Aided Civil and Infrastructure Engineering, v. 24, n. 3 (April 2009).

    https://doi.org/10.1111/j.1467-8667.2008.00565.x

  14. Kamat, Vineet R. / Martinez, Julio C. (2008): Generic representation of 3D motion paths in dynamic animations of simulated construction processes. In: Automation in Construction, v. 17, n. 2 (January 2008).

    https://doi.org/10.1016/j.autcon.2007.04.002

  15. East, E. William / Martinez, Julio C. / Kirby, Jeffrey G. (2009): Discrete-event simulation based performance quantification of web-based and traditional bidder inquiry processes. In: Automation in Construction, v. 18, n. 2 (March 2009).

    https://doi.org/10.1016/j.autcon.2008.05.003

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine