Julio C. Martinez
- Visualizing Simulated Construction Operations in 3D. In: Journal of Computing in Civil Engineering, v. 15, n. 4 (Oktober 2001). (2001):
- Runtime User Interaction in Concurrent Simulation-Animations of Construction Operations. In: Journal of Computing in Civil Engineering, v. 23, n. 6 (November 2009). (2009):
- Dynamic Three-Dimensional Visualization of Fluid Construction Materials. In: Journal of Computing in Civil Engineering, v. 18, n. 3 (Juli 2004). (2004):
- Large-Scale Dynamic Terrain in Three-Dimensional Construction Process Visualizations. In: Journal of Computing in Civil Engineering, v. 19, n. 2 (April 2005). (2005):
- Dynamic 3D Visualization of Articulated Construction Equipment. In: Journal of Computing in Civil Engineering, v. 19, n. 4 (Oktober 2005). (2005):
- Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management. In: Journal of Construction Engineering and Management, v. 136, n. 1 (Januar 2010). (2010):
- General-Purpose Systems for Effective Construction Simulation. In: Journal of Construction Engineering and Management, v. 125, n. 4 (August 1999). (1999):
- Comparison of Construction Alternatives Using Matched Simulation Experiments. In: Journal of Construction Engineering and Management, v. 122, n. 3 (September 1996). (1996):
- Discrete-Event Simulation-Based Virtual Reality Environments for Construction Operations: Technology Introduction. In: Journal of Construction Engineering and Management, v. 137, n. 3 (März 2011). (2011):
- Research in Visualization Techniques for Field Construction. In: Journal of Construction Engineering and Management, v. 137, n. 10 (Oktober 2011). (2011):
- Modeling of Simultaneously Continuous and Stochastic Construction Activities for Simulation. In: Journal of Construction Engineering and Management, v. 139, n. 8 (August 2013). (2013):
- Scene Graph and Frame Update Algorithms for Smooth and Scalable 3D Visualization of Simulated Construction Operations. In: Computer-Aided Civil and Infrastructure Engineering, v. 17, n. 4 (Juli 2002). (2002):
- Algorithm for Accurate Three-Dimensional Scene Graph Updates in High-Speed Animations of Previously Simulated Construction Operations. In: Computer-Aided Civil and Infrastructure Engineering, v. 24, n. 3 (April 2009). (2009):
- Generic representation of 3D motion paths in dynamic animations of simulated construction processes. In: Automation in Construction, v. 17, n. 2 (Januar 2008). (2008):
- Discrete-event simulation based performance quantification of web-based and traditional bidder inquiry processes. In: Automation in Construction, v. 18, n. 2 (März 2009). (2009):