0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Ibrahim Mahamid

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Mahamid, Ibrahim (2011): Risk matrix for factors affecting time delay in road construction projects: owners' perspective. In: Engineering, Construction and Architectural Management, v. 18, n. 6 (November 2011).

    https://doi.org/10.1108/09699981111180917

  2. Mahamid, Ibrahim (2012): Factors affecting contractor's business failure: contractors' perspective. In: Engineering, Construction and Architectural Management, v. 19, n. 3 (April 2012).

    https://doi.org/10.1108/09699981211219607

  3. Mahamid, Ibrahim (2013): Contractors perspective toward factors affecting labor productivity in building construction. In: Engineering, Construction and Architectural Management, v. 20, n. 5 (September 2013).

    https://doi.org/10.1108/ecam-08-2011-0074

  4. Mahamid, Ibrahim (2016): Preliminary estimate for reinforcement steel quantity in residential buildings. In: Organization, Technology and Management in Construction, v. 8, n. 1 (December 2016).

    https://doi.org/10.1515/otmcj-2016-0006

  5. Mahamid, Ibrahim (2013): Frequency of time overrun causes in road construction in Palestine: Contractors’ View. In: Organization, Technology and Management in Construction, v. 5, n. 1 (June 2013).

    https://doi.org/10.5592/otmcj.2013.1.9

  6. Mahamid, Ibrahim (2014): Contractors’ perception of risk factors affecting cost overrun in building projects in Palestine. In: The IES Journal Part A: Civil & Structural Engineering, v. 7, n. 1 (January 2014).

    https://doi.org/10.1080/19373260.2013.854180

  7. Mahamid, Ibrahim (2018): Critical Determinants of Public Construction Tendering Costs. In: International Journal of Architecture Engineering and Construction, v. 7, n. 1 (March 2018).

    https://doi.org/10.7492/ijaec.2018.005

  8. Mahamid, Ibrahim (2017): Schedule Delay in Saudi Arabia Road Construction Projects: Size, Estimate, Determinants and Effects. In: International Journal of Architecture Engineering and Construction, v. 6, n. 3 (September 2017).

    https://doi.org/10.7492/ijaec.2017.017

  9. Mahamid, Ibrahim / Bruland, Amund / Dmaidi, Nabil (2012): Causes of Delay in Road Construction Projects. In: Journal of Management in Engineering (ASCE), v. 28, n. 3 (July 2012).

    https://doi.org/10.1061/(asce)me.1943-5479.0000096

  10. Mahamid, Ibrahim (2013): Common risks affecting time overrun in road construction projects in Palestine: Contractors' perspective. In: Australasian Journal of Construction Economics and Building, v. 13, n. 2 (June 2013).

    https://doi.org/10.5130/ajceb.v13i2.3194

  11. Mahamid, Ibrahim / Bruland, Amund (2012): Cost diviation in road construction projects: The case of Palestine. In: Australasian Journal of Construction Economics and Building, v. 12, n. 1 (March 2012).

    https://doi.org/10.5130/ajceb.v12i1.2427

  12. Mahamid, Ibrahim (2011): Early cost estimating for road construction projects using multiple regression techniques. In: Australasian Journal of Construction Economics and Building, v. 11, n. 4 (December 2011).

    https://doi.org/10.5130/ajceb.v11i4.2195

  13. Mahamid, Ibrahim (2016): Factors contributing to poor performance in construction projects: studies of Saudi Arabia. In: Australian Journal of Multi-Disciplinary Engineering, v. 12, n. 1 (January 2016).

    https://doi.org/10.1080/14488388.2016.1243034

  14. Mahamid, Ibrahim (2016): Analysis of Rework in Residential Building Projects in Palestine. In: Jordan Journal of Civil Engineering, v. 10, n. 2 ( 2016).

    https://doi.org/10.14525/jjce.10.1.3536

  15. Dmaidi, Nabil / Mahamid, Ibrahim / Shweiki, Inas (2016): Identifying the Critical Problems of Construction Contracting Management in Palestine. In: Jordan Journal of Civil Engineering, v. 10, n. 1 ( 2016).

    https://doi.org/10.14525/jjce.10.1.3406

  16. Mahamid, Ibrahim (2017): Analysis of common factors leading to conflicts between contractors and their subcontractors in building construction projects. In: Australian Journal of Multi-Disciplinary Engineering, v. 13, n. 1 (January 2017).

    https://doi.org/10.1080/14488388.2017.1342515

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine