Ibrahim Mahamid

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Mahamid, Ibrahim (2011): Risk matrix for factors affecting time delay in road construction projects: owners' perspective. Dans: Engineering, Construction and Architectural Management, v. 18, n. 6 (novembre 2011).

    https://doi.org/10.1108/09699981111180917

  2. Mahamid, Ibrahim (2012): Factors affecting contractor's business failure: contractors' perspective. Dans: Engineering, Construction and Architectural Management, v. 19, n. 3 (avril 2012).

    https://doi.org/10.1108/09699981211219607

  3. Mahamid, Ibrahim (2013): Contractors perspective toward factors affecting labor productivity in building construction. Dans: Engineering, Construction and Architectural Management, v. 20, n. 5 (septembre 2013).

    https://doi.org/10.1108/ecam-08-2011-0074

  4. Mahamid, Ibrahim (2016): Preliminary estimate for reinforcement steel quantity in residential buildings. Dans: Organization, Technology and Management in Construction, v. 8, n. 1 (décembre 2016).

    https://doi.org/10.1515/otmcj-2016-0006

  5. Mahamid, Ibrahim (2013): Frequency of time overrun causes in road construction in Palestine: Contractors’ View. Dans: Organization, Technology and Management in Construction, v. 5, n. 1 (juin 2013).

    https://doi.org/10.5592/otmcj.2013.1.9

  6. Mahamid, Ibrahim (2014): Contractors’ perception of risk factors affecting cost overrun in building projects in Palestine. Dans: The IES Journal Part A: Civil & Structural Engineering, v. 7, n. 1 (janvier 2014).

    https://doi.org/10.1080/19373260.2013.854180

  7. Mahamid, Ibrahim (2018): Critical Determinants of Public Construction Tendering Costs. Dans: International Journal of Architecture Engineering and Construction, v. 7, n. 1 (mars 2018).

    https://doi.org/10.7492/ijaec.2018.005

  8. Mahamid, Ibrahim (2017): Schedule Delay in Saudi Arabia Road Construction Projects: Size, Estimate, Determinants and Effects. Dans: International Journal of Architecture Engineering and Construction, v. 6, n. 3 (septembre 2017).

    https://doi.org/10.7492/ijaec.2017.017

  9. Mahamid, Ibrahim / Bruland, Amund / Dmaidi, Nabil (2012): Causes of Delay in Road Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 28, n. 3 (juillet 2012).

    https://doi.org/10.1061/(asce)me.1943-5479.0000096

  10. Mahamid, Ibrahim (2013): Common risks affecting time overrun in road construction projects in Palestine: Contractors' perspective. Dans: Australasian Journal of Construction Economics and Building, v. 13, n. 2 (juin 2013).

    https://doi.org/10.5130/ajceb.v13i2.3194

  11. Mahamid, Ibrahim / Bruland, Amund (2012): Cost diviation in road construction projects: The case of Palestine. Dans: Australasian Journal of Construction Economics and Building, v. 12, n. 1 (mars 2012).

    https://doi.org/10.5130/ajceb.v12i1.2427

  12. Mahamid, Ibrahim (2011): Early cost estimating for road construction projects using multiple regression techniques. Dans: Australasian Journal of Construction Economics and Building, v. 11, n. 4 (décembre 2011).

    https://doi.org/10.5130/ajceb.v11i4.2195

  13. Mahamid, Ibrahim (2016): Factors contributing to poor performance in construction projects: studies of Saudi Arabia. Dans: Australian Journal of Multi-Disciplinary Engineering, v. 12, n. 1 (janvier 2016).

    https://doi.org/10.1080/14488388.2016.1243034

  14. Mahamid, Ibrahim (2016): Analysis of Rework in Residential Building Projects in Palestine. Dans: Jordan Journal of Civil Engineering, v. 10, n. 2 ( 2016).

    https://doi.org/10.14525/jjce.10.1.3536

  15. Dmaidi, Nabil / Mahamid, Ibrahim / Shweiki, Inas (2016): Identifying the Critical Problems of Construction Contracting Management in Palestine. Dans: Jordan Journal of Civil Engineering, v. 10, n. 1 ( 2016).

    https://doi.org/10.14525/jjce.10.1.3406

  16. Mahamid, Ibrahim (2017): Analysis of common factors leading to conflicts between contractors and their subcontractors in building construction projects. Dans: Australian Journal of Multi-Disciplinary Engineering, v. 13, n. 1 (janvier 2017).

    https://doi.org/10.1080/14488388.2017.1342515

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine