Liang Y. Liu
- Relationship between Project Interaction and Performance Indicators. In: Journal of Construction Engineering and Management, v. 122, n. 2 (June 1996). (1996):
- Work Optimization with Association Rule Mining of Accelerated Deterioration in Building Components. In: Journal of Performance of Constructed Facilities (ASCE), v. 34, n. 3 (June 2020). (2020):
- Prediction of Project Performance Based on Degree of Interaction. In: Journal of Management in Engineering (ASCE), v. 13, n. 2 (March 1997). (1997):
- Mobile Ad Hoc Network-Enabled Collaboration Framework Supporting Civil Engineering Emergency Response Operations. In: Journal of Computing in Civil Engineering, v. 24, n. 3 (May 2010). (2010):
- Object-Oriented Model for Integrating Construction Product and Process Information. In: Journal of Computing in Civil Engineering, v. 10, n. 3 (July 1996). (1996):
- Contemporaneous Time Series and Forecasting Methodologies for Predicting Short-Term Productivity. In: Journal of Construction Engineering and Management, v. 136, n. 9 (September 2010). (2010):
- Verification and validation of a project collaboration tool. In: Automation in Construction, v. 17, n. 2 (January 2008). (2008):
- Design Review Checking System with Corporate Lessons Learned. In: Journal of Construction Engineering and Management, v. 129, n. 5 (October 2003). (2003):
- Analytical Model for Analyzing Construction Claims and Opportunistic Bidding. In: Journal of Construction Engineering and Management, v. 130, n. 1 (February 2004). (2004):
- Impact of Management Approach on Project Interaction and Performance. In: Journal of Construction Engineering and Management, v. 123, n. 4 (December 1997). (1997):
- How to Evaluate and Invest in Emerging A/E/C Technologies under Uncertainty. In: Journal of Construction Engineering and Management, v. 129, n. 1 (February 2003). (2003):
- Multiproject Planning and Resource Controls for Facility Management. In: Journal of Construction Engineering and Management, v. 132, n. 12 (December 2006). (2006):
- An option pricing-based model for evaluating the financial viability of privatized infrastructure projects. In: Construction Management and Economics, v. 20, n. 2 (March 2002). (2002):
- Knowledge-Based Optimization of Building Maintenance, Repair, and Renovation Activities to Improve Facility Life Cycle Investments. In: Journal of Performance of Constructed Facilities (ASCE), v. 28, n. 3 (June 2014). (2014):
- Cost Information Model for Managing Multiple Projects. In: Journal of Construction Engineering and Management, v. 133, n. 12 (December 2007). (2007):
- Discrete Markov Approach for Building Component Condition, Reliability, and Service-Life Prediction Modeling. In: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 5 (October 2016). (2016):