0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Lee, Jae-Seob (2022): Simulating Competitive Bidding in Construction Collusive Bidding Cases. In: Journal of Management in Engineering (ASCE), v. 38, n. 5 (September 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001081

  2. Lee, Jae-Seob (2021): Quantifying costs of the productivity loss due to schedule changes in construction projects. In: Engineering, Construction and Architectural Management, v. 30, n. 1 (August 2021).

    https://doi.org/10.1108/ecam-07-2021-0571

  3. Lee, Jae-Seob (2021): Life Cycle Costing for Exterior Materials on Building Façade. In: Journal of Construction Engineering and Management, v. 147, n. 7 (July 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002068

  4. Lee, Jae-Seob / Kim, Woo-Ram / Jeong, Kichang (2021): Estimating Damages from Bid-Rigging in the Construction Industry. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 3 (August 2021).

    https://doi.org/10.1061/(asce)la.1943-4170.0000476

  5. Lee, Hyun-Soo / Lee, Jae-Yong / Lee, Jae-Seob (1999): Nonshored Formwork System for Top-Down Construction. In: Journal of Construction Engineering and Management, v. 125, n. 6 (December 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:6(392)

  6. Lee, Jae-Seob / Diekmann, James E. (2011): Delay analysis considering production rate. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 4 (April 2011).

    https://doi.org/10.1139/l11-006

  7. Lee, Jae-Seob (2016): Estimating Cumulative Damages due to Disruptions in Repetitive Construction. In: Journal of Construction Engineering and Management, v. 142, n. 11 (November 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001184

  8. Lee, Jae-Seob (2018): Value Engineering for Defect Prevention on Building Façade. In: Journal of Construction Engineering and Management, v. 144, n. 8 (August 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001500

  9. Lee, Jae-Seob (2015): Calculating cumulative inefficiency using earned value management in construction projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 42, n. 4 (April 2015).

    https://doi.org/10.1139/cjce-2014-0029

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine