Jae-Seob Lee
- Simulating Competitive Bidding in Construction Collusive Bidding Cases. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 5 (septembre 2022). (2022):
- Quantifying costs of the productivity loss due to schedule changes in construction projects. Dans: Engineering, Construction and Architectural Management, v. 30, n. 1 (août 2021). (2021):
- Life Cycle Costing for Exterior Materials on Building Façade. Dans: Journal of Construction Engineering and Management, v. 147, n. 7 (juillet 2021). (2021):
- Estimating Damages from Bid-Rigging in the Construction Industry. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 3 (août 2021). (2021):
- Nonshored Formwork System for Top-Down Construction. Dans: Journal of Construction Engineering and Management, v. 125, n. 6 (décembre 1999). (1999):
- Delay analysis considering production rate. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 4 (avril 2011). (2011):
- Estimating Cumulative Damages due to Disruptions in Repetitive Construction. Dans: Journal of Construction Engineering and Management, v. 142, n. 11 (novembre 2016). (2016):
- Value Engineering for Defect Prevention on Building Façade. Dans: Journal of Construction Engineering and Management, v. 144, n. 8 (août 2018). (2018):
- Calculating cumulative inefficiency using earned value management in construction projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 42, n. 4 (avril 2015). (2015):