Edmond W. M. Lam
- Critical factors that influence lean premise design implementation: a case of Hong Kong high-rise buildings. In: Architectural Engineering and Design Management. :
- (2022): Effectiveness and Advancements of Heritage Revitalizations on Community Planning: Case Studies in Hong Kong. In: Buildings, v. 12, n. 8 (31 July 2022).
- Optimal cooling intervention for construction workers in a hot and humid environment. In: Building and Environment, v. 118 (June 2017). (2017):
- Determining an optimal recovery time after exercising to exhaustion in a controlled climatic environment: Application to construction works. In: Building and Environment, v. 56 (October 2012). (2012):
- (2019): The Architecture of Built Pedagogy for Active Learning—A Case Study of a University Campus in Hong Kong. In: Buildings, v. 9, n. 11 (31 October 2019).
- Framework of Success Criteria for Design/Build Projects. In: Journal of Management in Engineering (ASCE), v. 18, n. 3 (July 2002). (2002):
- Development of the Design-Build Procurement System in Hong Kong. In: Architectural Science Review, v. 47, n. 4 (December 2004). (2004):
- Perceptions on the Application of Design-Build Procurement System in Hong Kong. In: Architectural Science Review, v. 46, n. 4 (December 2003). (2003):
- Lessons from Managing Design-Build Construction Projects in Hong Kong. In: Architectural Science Review, v. 49, n. 2 (June 2006). (2006):
- Barriers to Applying the Design-build Procurement Method in Hong Kong. In: Architectural Science Review, v. 49, n. 2 (June 2006). (2006):
- Wearing comfort of two construction work uniforms. In: Construction Innovation, v. 15, n. 4 (October 2015). (2015):
- Work at Height Fatalities in the Repair, Maintenance, Alteration, and Addition Works. In: Journal of Construction Engineering and Management, v. 134, n. 7 (July 2008). (2008):