Seon-Gyoo Kim
- Practical Application of Two-Way Multiple Overlapping Relationships in a BDM Network. In: Journal of Civil Engineering and Architecture, v. 10, n. 12 (December 2016). (2016):
- Probabilistic Project Duration Estimation Based on Uncertainty of Linkage between Activities. In: Journal of Civil Engineering and Architecture, v. 14, n. 4 (April 2020). (2020):
- A Risk Performance Measurement System for the Mega-Project. In: Architectural Research, v. 12, n. 1 (June 2010). (2010):
- Risk Performance Indexes and Measurement Systems for Mega Construction Projects. In: Journal of Civil Engineering and Management, v. 16, n. 4 (December 2010). (2010):
- CPM Schedule Summarizing Function of the Beeline Diagramming Method. In: Journal of Asian Architecture and Building Engineering, v. 11, n. 2 (November 2012). (2012):