Seon-Gyoo Kim
- Practical Application of Two-Way Multiple Overlapping Relationships in a BDM Network. Dans: Journal of Civil Engineering and Architecture, v. 10, n. 12 (décembre 2016). (2016):
- Probabilistic Project Duration Estimation Based on Uncertainty of Linkage between Activities. Dans: Journal of Civil Engineering and Architecture, v. 14, n. 4 (avril 2020). (2020):
- A Risk Performance Measurement System for the Mega-Project. Dans: Architectural Research, v. 12, n. 1 (juin 2010). (2010):
- Risk Performance Indexes and Measurement Systems for Mega Construction Projects. Dans: Journal of Civil Engineering and Management, v. 16, n. 4 (décembre 2010). (2010):
- CPM Schedule Summarizing Function of the Beeline Diagramming Method. Dans: Journal of Asian Architecture and Building Engineering, v. 11, n. 2 (novembre 2012). (2012):