0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kim, Kyong Ju / Kim, Deok Soo / Kim, Kyoungmin / Kim, Eu Wang / Shin, Yeon Ju: Estimating Hypothetical Competitive Bid Price on Bid-rigged Projects Based on the Weights of Major Work Groups. In: KSCE Journal of Civil Engineering.

    https://doi.org/10.1007/s12205-024-1891-9

  2. Kim, Kyong Ju / Han, Bonghee / Park, Min Seo / Kim, Kyoungmin / Kim, Eu Wang (2022): Application Issues of Impacted As-Planned Schedule for Delay Analysis. In: Buildings, v. 12, n. 9 (16 September 2022).

    https://doi.org/10.3390/buildings12091442

  3. Kim, Eu Wang / Park, Min Seo / Kim, Kyoungmin / Kim, Kyong Ju (2022): Blockchain-Based Automatic Tracking and Extracting Construction Document for Claim and Dispute Support. In: KSCE Journal of Civil Engineering, v. 26, n. 9 (1 August 2022).

    https://doi.org/10.1007/s12205-022-2181-z

  4. Kim, Kyong Ju / Kim, Kyoungmin / Kim, Eu Wang / Nguyen, Thi Ha Tho (2021): Estimating Damages of Bid-Rigging in Design-Build Contracts Based on Simulation Model. In: KSCE Journal of Civil Engineering, v. 25, n. 5 (12 March 2021).

    https://doi.org/10.1007/s12205-021-1571-y

  5. Kim, Kyong Ju / Kim, Kyoungmin / Kang, Ki Yong (2010): Valuation on the Intangible Benefits of EVMS using CVM. In: Journal of Asian Architecture and Building Engineering, v. 9, n. 1 (May 2010).

    https://doi.org/10.3130/jaabe.9.221

  6. Lee, Han Rok / Yu, Junsang / Yun, Won Gun / Nam, Jaewoo / Kim, Kyong Ju (2019): Estimating Environmental Load of PSC Beam Bridge using Standard Quantities and Resource DB Model. In: KSCE Journal of Civil Engineering, v. 23, n. 2 (January 2019).

    https://doi.org/10.1007/s12205-019-1013-2

  7. Kim, Kyong Ju / Kim, Kyoungmin (2010): Preliminary Cost Estimation Model Using Case-Based Reasoning and Genetic Algorithms. In: Journal of Computing in Civil Engineering, v. 24, n. 6 (November 2010).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000054

  8. Kim, Kyong Ju / Kim, Kyoungmin (2010): Case Study on the Evaluation of Equipment Flow at a Construction Site. In: Journal of Computing in Civil Engineering, v. 24, n. 6 (November 2010).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000051

  9. Oh, Chi Don / Park, Chansik / Kim, Kyong Ju (2012): An approximate cost estimation model based on standard quantities of steel box girder bridge substructure. In: KSCE Journal of Civil Engineering, v. 17, n. 5 (December 2012).

    https://doi.org/10.1007/s12205-013-0287-z

  10. Kim, Kyong Ju / Yun, Won Gun / Kim, In Kyum (2016): Estimating approximate construction duration of CFRD in the planning stage. In: KSCE Journal of Civil Engineering, v. 20, n. 7 (January 2016).

    https://doi.org/10.1007/s12205-016-0810-0

  11. Kim, Kyong Ju / Cho, Jin-Young / Lee, Dong-Youl / Lee, Min-jae (2014): Development of an automated As-planned schedule system for efficient scheduling. In: KSCE Journal of Civil Engineering, v. 20, n. 4 (December 2014).

    https://doi.org/10.1007/s12205-015-0234-2

  12. Kim, Kyong Ju / Yun, Won Gun / Lee, Ju-hyun / Kim, Kyoungmin (2014): Schedule compression in tunneling projects by adjusting workflow variability. In: KSCE Journal of Civil Engineering, v. 18, n. 6 (August 2014).

    https://doi.org/10.1007/s12205-014-1466-2

  13. Lee, Ju-hyun / Kim, Kyong Ju / Kim, Eu Wang / Kim, Heung Rae (2017): Environmental Load Estimating Model of NATM Tunnel based on Standard Quantity of Major Works in the Early Design Phase. In: KSCE Journal of Civil Engineering, v. 22, n. 4 (June 2017).

    https://doi.org/10.1007/s12205-017-1795-z

  14. Kim, Kyong Ju / Kim, Kyoungmin / Kang, Chan Sung (2009): Approximate cost estimating model for PSC Beam bridge based on quantity of standard work. In: KSCE Journal of Civil Engineering, v. 13, n. 6 (September 2009).

    https://doi.org/10.1007/s12205-009-0377-0

  15. Kwon, Suk-Hyun / Kim, Kyong Ju / Kim, Kyoungmin / Cho, Namho (2012): Assessment model on environmental economics for construction projects in Korea. In: KSCE Journal of Civil Engineering, v. 16, n. 4 (April 2012).

    https://doi.org/10.1007/s12205-012-1363-5

  16. Kim, Kyong Ju / Gibson, G. Edward (1999): A development of knowledge-embedded, modularized simulation modeling system for heavy construction operations. In: KSCE Journal of Civil Engineering, v. 3, n. 3 (September 1999).

    https://doi.org/10.1007/bf02823811

  17. Kim, Kyoungmin / Kim, Kyong Ju (2010): Multi-agent-based simulation system for construction operations with congested flows. In: Automation in Construction, v. 19, n. 7 (November 2010).

    https://doi.org/10.1016/j.autcon.2010.05.005

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine