Kyong Ju Kim
- Estimating Hypothetical Competitive Bid Price on Bid-rigged Projects Based on the Weights of Major Work Groups. Dans: KSCE Journal of Civil Engineering, v. 28, n. 8 (22 juin 2024). (2024):
- (2022): Application Issues of Impacted As-Planned Schedule for Delay Analysis. Dans: Buildings, v. 12, n. 9 (16 septembre 2022).
- Blockchain-Based Automatic Tracking and Extracting Construction Document for Claim and Dispute Support. Dans: KSCE Journal of Civil Engineering, v. 26, n. 9 (1 août 2022). (2022):
- Estimating Damages of Bid-Rigging in Design-Build Contracts Based on Simulation Model. Dans: KSCE Journal of Civil Engineering, v. 25, n. 5 (12 mars 2021). (2021):
- Valuation on the Intangible Benefits of EVMS using CVM. Dans: Journal of Asian Architecture and Building Engineering, v. 9, n. 1 (mai 2010). (2010):
- Estimating Environmental Load of PSC Beam Bridge using Standard Quantities and Resource DB Model. Dans: KSCE Journal of Civil Engineering, v. 23, n. 2 (janvier 2019). (2019):
- Preliminary Cost Estimation Model Using Case-Based Reasoning and Genetic Algorithms. Dans: Journal of Computing in Civil Engineering, v. 24, n. 6 (novembre 2010). (2010):
- Case Study on the Evaluation of Equipment Flow at a Construction Site. Dans: Journal of Computing in Civil Engineering, v. 24, n. 6 (novembre 2010). (2010):
- An approximate cost estimation model based on standard quantities of steel box girder bridge substructure. Dans: KSCE Journal of Civil Engineering, v. 17, n. 5 (décembre 2012). (2012):
- Estimating approximate construction duration of CFRD in the planning stage. Dans: KSCE Journal of Civil Engineering, v. 20, n. 7 (janvier 2016). (2016):
- Development of an automated As-planned schedule system for efficient scheduling. Dans: KSCE Journal of Civil Engineering, v. 20, n. 4 (décembre 2014). (2014):
- Schedule compression in tunneling projects by adjusting workflow variability. Dans: KSCE Journal of Civil Engineering, v. 18, n. 6 (août 2014). (2014):
- Environmental Load Estimating Model of NATM Tunnel based on Standard Quantity of Major Works in the Early Design Phase. Dans: KSCE Journal of Civil Engineering, v. 22, n. 4 (juin 2017). (2017):
- Approximate cost estimating model for PSC Beam bridge based on quantity of standard work. Dans: KSCE Journal of Civil Engineering, v. 13, n. 6 (septembre 2009). (2009):
- Assessment model on environmental economics for construction projects in Korea. Dans: KSCE Journal of Civil Engineering, v. 16, n. 4 (avril 2012). (2012):
- A development of knowledge-embedded, modularized simulation modeling system for heavy construction operations. Dans: KSCE Journal of Civil Engineering, v. 3, n. 3 (septembre 1999). (1999):
- Multi-agent-based simulation system for construction operations with congested flows. Dans: Automation in Construction, v. 19, n. 7 (novembre 2010). (2010):