0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Jeong, Jiseok / Kim, Changwan (2022): Comparison of Machine Learning Approaches for Medium-to-Long-Term Financial Distress Predictions in the Construction Industry. In: Buildings, v. 12, n. 10 (20 September 2022).

    https://doi.org/10.3390/buildings12101759

  2. Son, Hyojoo / Kim, Changwan (2016): Evolutionary Multi-objective Optimization in Building Retrofit Planning Problem. In: Procedia Engineering, v. 145 ( 2016).

    https://doi.org/10.1016/j.proeng.2016.04.045

  3. Kim, Hyunsoo / Kim, Changwan (2021): 3D as-built modeling from incomplete point clouds using connectivity relations. In: Automation in Construction, v. 130 (October 2021).

    https://doi.org/10.1016/j.autcon.2021.103855

  4. Son, Hyojoo / Kim, Changwan (2021): Integrated worker detection and tracking for the safe operation of construction machinery. In: Automation in Construction, v. 126 (June 2021).

    https://doi.org/10.1016/j.autcon.2021.103670

  5. Son, Hyojoo / Kim, Changwan / Cho, Yong Kwon (2017): Automated Schedule Updates Using As-Built Data and a 4D Building Information Model. In: Journal of Management in Engineering (ASCE), v. 33, n. 4 (July 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000528

  6. Son, Hyojoo / Kim, Changmin / Kim, Changwan / Kang, Youngcheol (2015): Prediction of Government-owned Building Energy Consumption Based on an Rrelieff and Support Vector Machine Model. In: Journal of Civil Engineering and Management, v. 21, n. 6 (June 2015).

    https://doi.org/10.3846/13923730.2014.893908

  7. Chen, Jingdao / Fang, Yihai / Cho, Yong K. / Kim, Changwan (2017): Principal Axes Descriptor for Automated Construction-Equipment Classification from Point Clouds. In: Journal of Computing in Civil Engineering, v. 31, n. 2 (March 2017).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000628

  8. Son, Hyojoo / Kim, Changmin / Kim, Changwan (2012): Automated Color Model–Based Concrete Detection in Construction-Site Images by Using Machine Learning Algorithms. In: Journal of Computing in Civil Engineering, v. 26, n. 3 (May 2012).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000141

  9. Kim, Changwan / Haas, Carl T. / Liapi, Katherine A. / Caldas, Carlos H. (2006): Human-Assisted Obstacle Avoidance System Using 3D Workspace Modeling for Construction Equipment Operation. In: Journal of Computing in Civil Engineering, v. 20, n. 3 (May 2006).

    https://doi.org/10.1061/(asce)0887-3801(2006)20:3(177)

  10. Son, Hyojoo / Kim, Changmin / Kim, Changwan (2015): Fully Automated As-Built 3D Pipeline Extraction Method from Laser-Scanned Data Based on Curvature Computation. In: Journal of Computing in Civil Engineering, v. 29, n. 4 (July 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000401

  11. Son, Hyojoo / Choi, Hyunchul / Seong, Hyeonwoo / Kim, Changwan (2019): Detection of construction workers under varying poses and changing background in image sequences via very deep residual networks. In: Automation in Construction, v. 99 (March 2019).

    https://doi.org/10.1016/j.autcon.2018.11.033

  12. Son, Hyojoo / Hwang, Nahyae / Kim, Changwan / Cho, Yong (2015): Construction professionals' perceived benefits of PMIS: The effects of PMIS quality and computer self-efficacy. In: KSCE Journal of Civil Engineering, v. 20, n. 2 (April 2015).

    https://doi.org/10.1007/s12205-015-0138-1

  13. Son, Hyojoo / Kim, Changwan (2013): Multiimaging Sensor Data Fusion-Based Enhancement for 3D Workspace Representation for Remote Machine Operation. In: Journal of Construction Engineering and Management, v. 139, n. 4 (April 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000630

  14. Kang, Youngcheol / Kim, Changwan / Son, Hyojoo / Lee, Seungtaek / Limsawasd, Charinee (2013): Comparison of Preproject Planning for Green and Conventional Buildings. In: Journal of Construction Engineering and Management, v. 139, n. 11 (November 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000760

  15. Chou, Jui-Sheng / Kim, Changwan / Tsai, Pei-Yu / Yeh, Chun-Pin / Son, Hyojoo (2016): Longitudinal assessment of high-speed rail service delivery, satisfaction and operations: A study of Taiwan and Korea systems. In: KSCE Journal of Civil Engineering, v. 21, n. 6 (December 2016).

    https://doi.org/10.1007/s12205-017-1140-6

  16. Koranda, Collin / Chong, Wai Kiong / Kim, Changwan / Chou, Jui-Sheng / Kim, Changmin (2012): An investigation of the applicability of sustainability and lean concepts to small construction projects. In: KSCE Journal of Civil Engineering, v. 16, n. 5 (June 2012).

    https://doi.org/10.1007/s12205-012-1460-5

  17. Kwon, Soon-Wook / Bosché, Frédéric / Kim, Changwan / Haas, Carl T. / Liapi, Katherine A. (2004): Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds. In: Automation in Construction, v. 13, n. 1 (January 2004).

    https://doi.org/10.1016/j.autcon.2003.08.007

  18. Kim, Changmin / Son, Hyojoo / Kim, Changwan (2013): Automated construction progress measurement using a 4D building information model and 3D data. In: Automation in Construction, v. 31 (May 2013).

    https://doi.org/10.1016/j.autcon.2012.11.041

  19. Kim, Changwan / Haas, Carl T. / Liapi, Katherine A. (2005): Rapid, on-site spatial information acquisition and its use for infrastructure operation and maintenance. In: Automation in Construction, v. 14, n. 5 (October 2005).

    https://doi.org/10.1016/j.autcon.2005.02.002

  20. Park, Yoora / Son, Hyojoo / Kim, Changwan (2012): Investigating the determinants of construction professionals' acceptance of web-based training: An extension of the technology acceptance model. In: Automation in Construction, v. 22 (March 2012).

    https://doi.org/10.1016/j.autcon.2011.09.016

  21. Kim, Changyoon / Kim, Hyoungkwan / Han, Seung H. / Kim, Changwan / Kim, Moon Kyum / Park, Sang H. (2009): Developing a technology roadmap for construction R&D through interdisciplinary research efforts. In: Automation in Construction, v. 18, n. 3 (May 2009).

    https://doi.org/10.1016/j.autcon.2008.09.008

  22. Son, Hyojoo / Kim, Changmin / Kim, Changwan (2012): Hybrid principal component analysis and support vector machine model for predicting the cost performance of commercial building projects using pre-project planning variables. In: Automation in Construction, v. 27 (November 2012).

    https://doi.org/10.1016/j.autcon.2012.05.013

  23. Son, Hyojoo / Kim, Changwan (2016): Automatic segmentation and 3D modeling of pipelines into constituent parts from laser-scan data of the built environment. In: Automation in Construction, v. 68 (August 2016).

    https://doi.org/10.1016/j.autcon.2016.05.010

  24. Kim, Changmin / Son, Hyojoo / Kim, Changwan (2013): Fully automated registration of 3D data to a 3D CAD model for project progress monitoring. In: Automation in Construction, v. 35 (November 2013).

    https://doi.org/10.1016/j.autcon.2013.01.005

  25. Son, Hyojoo / Kim, Changmin / Kim, Changwan (2015): 3D reconstruction of as-built industrial instrumentation models from laser-scan data and a 3D CAD database based on prior knowledge. In: Automation in Construction, v. 49 (January 2015).

    https://doi.org/10.1016/j.autcon.2014.08.007

  26. Son, Hyojoo / Hwang, Nahyae / Kim, Changmin / Kim, Changwan (2014): Rapid and automated determination of rusted surface areas of a steel bridge for robotic maintenance systems. In: Automation in Construction, v. 42 (June 2014).

    https://doi.org/10.1016/j.autcon.2014.02.016

  27. Wang, Chao / Cho, Yong K. / Kim, Changwan (2015): Automatic BIM component extraction from point clouds of existing buildings for sustainability applications. In: Automation in Construction, v. 56 (August 2015).

    https://doi.org/10.1016/j.autcon.2015.04.001

  28. Kim, Changwan / Son, Hyojoo / Kim, Hyoungkwan / Han, Seung Heon (2008): Applicability of flash laser distance and ranging to three-dimensional spatial information acquisition and modeling on a construction site. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 11 (November 2008).

    https://doi.org/10.1139/l08-082

  29. Son, Hyojoo / Kim, Changwan / Choi, Kwangnam (2010): Rapid 3D object detection and modeling using range data from 3D range imaging camera for heavy equipment operation. In: Automation in Construction, v. 19, n. 7 (November 2010).

    https://doi.org/10.1016/j.autcon.2010.06.003

  30. Son, Hyojoo / Kim, Changwan (2010): 3D structural component recognition and modeling method using color and 3D data for construction progress monitoring. In: Automation in Construction, v. 19, n. 7 (November 2010).

    https://doi.org/10.1016/j.autcon.2010.03.003

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine