0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Jeong, Jiseok / Kim, Changwan (2022): Comparison of Machine Learning Approaches for Medium-to-Long-Term Financial Distress Predictions in the Construction Industry. Dans: Buildings, v. 12, n. 10 (20 septembre 2022).

    https://doi.org/10.3390/buildings12101759

  2. Son, Hyojoo / Kim, Changwan (2016): Evolutionary Multi-objective Optimization in Building Retrofit Planning Problem. Dans: Procedia Engineering, v. 145 ( 2016).

    https://doi.org/10.1016/j.proeng.2016.04.045

  3. Kim, Hyunsoo / Kim, Changwan (2021): 3D as-built modeling from incomplete point clouds using connectivity relations. Dans: Automation in Construction, v. 130 (octobre 2021).

    https://doi.org/10.1016/j.autcon.2021.103855

  4. Son, Hyojoo / Kim, Changwan (2021): Integrated worker detection and tracking for the safe operation of construction machinery. Dans: Automation in Construction, v. 126 (juin 2021).

    https://doi.org/10.1016/j.autcon.2021.103670

  5. Son, Hyojoo / Kim, Changwan / Cho, Yong Kwon (2017): Automated Schedule Updates Using As-Built Data and a 4D Building Information Model. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 4 (juillet 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000528

  6. Son, Hyojoo / Kim, Changmin / Kim, Changwan / Kang, Youngcheol (2015): Prediction of Government-owned Building Energy Consumption Based on an Rrelieff and Support Vector Machine Model. Dans: Journal of Civil Engineering and Management, v. 21, n. 6 (juin 2015).

    https://doi.org/10.3846/13923730.2014.893908

  7. Chen, Jingdao / Fang, Yihai / Cho, Yong K. / Kim, Changwan (2017): Principal Axes Descriptor for Automated Construction-Equipment Classification from Point Clouds. Dans: Journal of Computing in Civil Engineering, v. 31, n. 2 (mars 2017).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000628

  8. Son, Hyojoo / Kim, Changmin / Kim, Changwan (2012): Automated Color Model–Based Concrete Detection in Construction-Site Images by Using Machine Learning Algorithms. Dans: Journal of Computing in Civil Engineering, v. 26, n. 3 (mai 2012).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000141

  9. Kim, Changwan / Haas, Carl T. / Liapi, Katherine A. / Caldas, Carlos H. (2006): Human-Assisted Obstacle Avoidance System Using 3D Workspace Modeling for Construction Equipment Operation. Dans: Journal of Computing in Civil Engineering, v. 20, n. 3 (mai 2006).

    https://doi.org/10.1061/(asce)0887-3801(2006)20:3(177)

  10. Son, Hyojoo / Kim, Changmin / Kim, Changwan (2015): Fully Automated As-Built 3D Pipeline Extraction Method from Laser-Scanned Data Based on Curvature Computation. Dans: Journal of Computing in Civil Engineering, v. 29, n. 4 (juillet 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000401

  11. Son, Hyojoo / Choi, Hyunchul / Seong, Hyeonwoo / Kim, Changwan (2019): Detection of construction workers under varying poses and changing background in image sequences via very deep residual networks. Dans: Automation in Construction, v. 99 (mars 2019).

    https://doi.org/10.1016/j.autcon.2018.11.033

  12. Son, Hyojoo / Hwang, Nahyae / Kim, Changwan / Cho, Yong (2015): Construction professionals' perceived benefits of PMIS: The effects of PMIS quality and computer self-efficacy. Dans: KSCE Journal of Civil Engineering, v. 20, n. 2 (avril 2015).

    https://doi.org/10.1007/s12205-015-0138-1

  13. Son, Hyojoo / Kim, Changwan (2013): Multiimaging Sensor Data Fusion-Based Enhancement for 3D Workspace Representation for Remote Machine Operation. Dans: Journal of Construction Engineering and Management, v. 139, n. 4 (avril 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000630

  14. Kang, Youngcheol / Kim, Changwan / Son, Hyojoo / Lee, Seungtaek / Limsawasd, Charinee (2013): Comparison of Preproject Planning for Green and Conventional Buildings. Dans: Journal of Construction Engineering and Management, v. 139, n. 11 (novembre 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000760

  15. Chou, Jui-Sheng / Kim, Changwan / Tsai, Pei-Yu / Yeh, Chun-Pin / Son, Hyojoo (2016): Longitudinal assessment of high-speed rail service delivery, satisfaction and operations: A study of Taiwan and Korea systems. Dans: KSCE Journal of Civil Engineering, v. 21, n. 6 (décembre 2016).

    https://doi.org/10.1007/s12205-017-1140-6

  16. Koranda, Collin / Chong, Wai Kiong / Kim, Changwan / Chou, Jui-Sheng / Kim, Changmin (2012): An investigation of the applicability of sustainability and lean concepts to small construction projects. Dans: KSCE Journal of Civil Engineering, v. 16, n. 5 (juin 2012).

    https://doi.org/10.1007/s12205-012-1460-5

  17. Kwon, Soon-Wook / Bosché, Frédéric / Kim, Changwan / Haas, Carl T. / Liapi, Katherine A. (2004): Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds. Dans: Automation in Construction, v. 13, n. 1 (janvier 2004).

    https://doi.org/10.1016/j.autcon.2003.08.007

  18. Kim, Changmin / Son, Hyojoo / Kim, Changwan (2013): Automated construction progress measurement using a 4D building information model and 3D data. Dans: Automation in Construction, v. 31 (mai 2013).

    https://doi.org/10.1016/j.autcon.2012.11.041

  19. Kim, Changwan / Haas, Carl T. / Liapi, Katherine A. (2005): Rapid, on-site spatial information acquisition and its use for infrastructure operation and maintenance. Dans: Automation in Construction, v. 14, n. 5 (octobre 2005).

    https://doi.org/10.1016/j.autcon.2005.02.002

  20. Park, Yoora / Son, Hyojoo / Kim, Changwan (2012): Investigating the determinants of construction professionals' acceptance of web-based training: An extension of the technology acceptance model. Dans: Automation in Construction, v. 22 (mars 2012).

    https://doi.org/10.1016/j.autcon.2011.09.016

  21. Kim, Changyoon / Kim, Hyoungkwan / Han, Seung H. / Kim, Changwan / Kim, Moon Kyum / Park, Sang H. (2009): Developing a technology roadmap for construction R&D through interdisciplinary research efforts. Dans: Automation in Construction, v. 18, n. 3 (mai 2009).

    https://doi.org/10.1016/j.autcon.2008.09.008

  22. Son, Hyojoo / Kim, Changmin / Kim, Changwan (2012): Hybrid principal component analysis and support vector machine model for predicting the cost performance of commercial building projects using pre-project planning variables. Dans: Automation in Construction, v. 27 (novembre 2012).

    https://doi.org/10.1016/j.autcon.2012.05.013

  23. Son, Hyojoo / Kim, Changwan (2016): Automatic segmentation and 3D modeling of pipelines into constituent parts from laser-scan data of the built environment. Dans: Automation in Construction, v. 68 (août 2016).

    https://doi.org/10.1016/j.autcon.2016.05.010

  24. Kim, Changmin / Son, Hyojoo / Kim, Changwan (2013): Fully automated registration of 3D data to a 3D CAD model for project progress monitoring. Dans: Automation in Construction, v. 35 (novembre 2013).

    https://doi.org/10.1016/j.autcon.2013.01.005

  25. Son, Hyojoo / Kim, Changmin / Kim, Changwan (2015): 3D reconstruction of as-built industrial instrumentation models from laser-scan data and a 3D CAD database based on prior knowledge. Dans: Automation in Construction, v. 49 (janvier 2015).

    https://doi.org/10.1016/j.autcon.2014.08.007

  26. Son, Hyojoo / Hwang, Nahyae / Kim, Changmin / Kim, Changwan (2014): Rapid and automated determination of rusted surface areas of a steel bridge for robotic maintenance systems. Dans: Automation in Construction, v. 42 (juin 2014).

    https://doi.org/10.1016/j.autcon.2014.02.016

  27. Wang, Chao / Cho, Yong K. / Kim, Changwan (2015): Automatic BIM component extraction from point clouds of existing buildings for sustainability applications. Dans: Automation in Construction, v. 56 (août 2015).

    https://doi.org/10.1016/j.autcon.2015.04.001

  28. Kim, Changwan / Son, Hyojoo / Kim, Hyoungkwan / Han, Seung Heon (2008): Applicability of flash laser distance and ranging to three-dimensional spatial information acquisition and modeling on a construction site. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 11 (novembre 2008).

    https://doi.org/10.1139/l08-082

  29. Son, Hyojoo / Kim, Changwan / Choi, Kwangnam (2010): Rapid 3D object detection and modeling using range data from 3D range imaging camera for heavy equipment operation. Dans: Automation in Construction, v. 19, n. 7 (novembre 2010).

    https://doi.org/10.1016/j.autcon.2010.06.003

  30. Son, Hyojoo / Kim, Changwan (2010): 3D structural component recognition and modeling method using color and 3D data for construction progress monitoring. Dans: Automation in Construction, v. 19, n. 7 (novembre 2010).

    https://doi.org/10.1016/j.autcon.2010.03.003

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine