Hybrid principal component analysis and support vector machine model for predicting the cost performance of commercial building projects using pre-project planning variables
Auteur(s): |
Hyojoo Son
Changmin Kim Changwan Kim |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, novembre 2012, v. 27 |
Page(s): | 60-66 |
DOI: | 10.1016/j.autcon.2012.05.013 |
- Informations
sur cette fiche - Reference-ID
10190114 - Publié(e) le:
10.12.2018 - Modifié(e) le:
10.12.2018