Diana Khairallah
- Monitoring of railway structures with bituminous and granular sub-layers: Assessment after four years of use. In: Construction and Building Materials, v. 336 (June 2022). (2022):
- Monitoring of railway structures of the high speed line BPL with bituminous and granular sublayers. In: Construction and Building Materials, v. 211 (June 2019). (2019):