Diana Khairallah
- Monitoring of railway structures with bituminous and granular sub-layers: Assessment after four years of use. Dans: Construction and Building Materials, v. 336 (juin 2022). (2022):
- Monitoring of railway structures of the high speed line BPL with bituminous and granular sublayers. Dans: Construction and Building Materials, v. 211 (juin 2019). (2019):