Stephen W. Jones
- Developing a tailored RBS linking to BIM for risk management of bridge projects. In: Engineering, Construction and Architectural Management, v. 23, n. 6 (November 2016). (2016):
- Business value of integrated BIM-based asset management. In: Engineering, Construction and Architectural Management, v. 26, n. 6 (July 2019). (2019):
- Columns with Semirigid Joints. In: Journal of the Structural Division (ASCE), v. 108, n. 2 (February 1982). (1982):
- Structural performance of optimised spirally deformed steel fibre. In: Engineering Structures, v. 219 (September 2020). (2020):
- Risk Information Management for Bridges by Integrating Risk Breakdown Structure into 3D/4D BIM. In: KSCE Journal of Civil Engineering, v. 23, n. 2 (January 2019). (2019):
- Retrieving similar cases for construction project risk management using Natural Language Processing techniques. In: Automation in Construction, v. 80 (August 2017). (2017):
- Development of a generic three-dimensional finite element fibre pullout model. In: Construction and Building Materials, v. 185 (October 2018). (2018):