Stephen W. Jones
- Developing a tailored RBS linking to BIM for risk management of bridge projects. Dans: Engineering, Construction and Architectural Management, v. 23, n. 6 (novembre 2016). (2016):
- Business value of integrated BIM-based asset management. Dans: Engineering, Construction and Architectural Management, v. 26, n. 6 (juillet 2019). (2019):
- Columns with Semirigid Joints. Dans: Journal of the Structural Division (ASCE), v. 108, n. 2 (février 1982). (1982):
- Structural performance of optimised spirally deformed steel fibre. Dans: Engineering Structures, v. 219 (septembre 2020). (2020):
- Risk Information Management for Bridges by Integrating Risk Breakdown Structure into 3D/4D BIM. Dans: KSCE Journal of Civil Engineering, v. 23, n. 2 (janvier 2019). (2019):
- Retrieving similar cases for construction project risk management using Natural Language Processing techniques. Dans: Automation in Construction, v. 80 (août 2017). (2017):
- Development of a generic three-dimensional finite element fibre pullout model. Dans: Construction and Building Materials, v. 185 (octobre 2018). (2018):