0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A. K. W. Jayawardane

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Jeyakanthan, J. / Jayawardane, A. K. W. (2012): Mitigating Delays in Donor Funded Road Projects in Sri Lanka. In: Engineer: Journal of the Institution of Engineers, Sri Lanka, v. 45, n. 1 (January 2012).

    https://doi.org/10.4038/engineer.v45i1.6950

  2. Hemachandra, D. G. / Jayawardane, A. K. W. (2007): Successes and Failures of Sri Lanka Railways in International Technology Transfer. In: Engineer: Journal of the Institution of Engineers, Sri Lanka, v. 40, n. 2 (April 2007).

    https://doi.org/10.4038/engineer.v40i2.7135

  3. Navaratna, Dimuth / Jayawardane, A. K. W. (2007): Total Factor Productivity in the Building Construction Industry in Sri Lanka. In: Engineer: Journal of the Institution of Engineers, Sri Lanka, v. 40, n. 1 (January 2007).

    https://doi.org/10.4038/engineer.v40i1.7129

  4. Jayawardane, A. K. W. / Price, A. D. F. / Harris, F. C. (1995): Measurement of brickwork and blockwork productivity, Part B. Part B illustrates the procedures for evaluating basic times and balancing gang sizes for various situations in brickwork and blockwork applications. In: Building Research & Information, v. 23, n. 3 ( 1995).

    https://doi.org/10.1080/09613219508727448

  5. Jayawardane, A. K. W. / Price, A. D. F. / Harris, F. C. (1995): Measurement of brickwork and blockwork productivity: Part A. Productivity of operations can be improved by accurate estimating, good planning, optimum use of resources and having a sound knowledge of the productivity variables. In: Building Research & Information, v. 23, n. 2 ( 1995).

    https://doi.org/10.1080/09613219508727433

  6. Jayawardane, A. K. W. / Price, A. D. F. (1994): A New approach for optimizing earth moving operations [Part 1]. In: Proceedings of the Institution of Civil Engineers - Transport, v. 105, n. 3 (August 1994).

    https://doi.org/10.1680/itran.1994.26795

  7. Jayawardane, A. K. W. / Price, A. D. F. (1994): A New Approach for optimizing earth moving operations [Part II]. In: Proceedings of the Institution of Civil Engineers - Transport, v. 105, n. 4 (January 1994).

    https://doi.org/10.1680/itran.1994.27136

  8. Jayawardane, A. K. W. / Harris, F. C. (1990): Further Development of Integer Programming in Earthwork Optimization. In: Journal of Construction Engineering and Management, v. 116, n. 1 (March 1990).

    https://doi.org/10.1061/(asce)0733-9364(1990)116:1(18)

  9. Jayawardane, A. K. W. / Gunawardena, N. D. (1998): Construction workers in developing countries: a case study of Sri Lanka. In: Construction Management and Economics, v. 16, n. 5 (September 1998).

    https://doi.org/10.1080/014461998372060

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine