A. K. W. Jayawardane
- Mitigating Delays in Donor Funded Road Projects in Sri Lanka. Dans: Engineer: Journal of the Institution of Engineers, Sri Lanka, v. 45, n. 1 (janvier 2012). (2012):
- Successes and Failures of Sri Lanka Railways in International Technology Transfer. Dans: Engineer: Journal of the Institution of Engineers, Sri Lanka, v. 40, n. 2 (avril 2007). (2007):
- Total Factor Productivity in the Building Construction Industry in Sri Lanka. Dans: Engineer: Journal of the Institution of Engineers, Sri Lanka, v. 40, n. 1 (janvier 2007). (2007):
- Measurement of brickwork and blockwork productivity, Part B. Part B illustrates the procedures for evaluating basic times and balancing gang sizes for various situations in brickwork and blockwork applications. Dans: Building Research & Information, v. 23, n. 3 ( 1995). (1995):
- Measurement of brickwork and blockwork productivity: Part A. Productivity of operations can be improved by accurate estimating, good planning, optimum use of resources and having a sound knowledge of the productivity variables. Dans: Building Research & Information, v. 23, n. 2 ( 1995). (1995):
- A New approach for optimizing earth moving operations [Part 1]. Dans: Proceedings of the Institution of Civil Engineers - Transport, v. 105, n. 3 (août 1994). (1994):
- A New Approach for optimizing earth moving operations [Part II]. Dans: Proceedings of the Institution of Civil Engineers - Transport, v. 105, n. 4 (janvier 1994). (1994):
- Further Development of Integer Programming in Earthwork Optimization. Dans: Journal of Construction Engineering and Management, v. 116, n. 1 (mars 1990). (1990):
- Construction workers in developing countries: a case study of Sri Lanka. Dans: Construction Management and Economics, v. 16, n. 5 (septembre 1998). (1998):