0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

A. K. W. Jayawardane

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Jeyakanthan, J. / Jayawardane, A. K. W. (2012): Mitigating Delays in Donor Funded Road Projects in Sri Lanka. Dans: Engineer: Journal of the Institution of Engineers, Sri Lanka, v. 45, n. 1 (janvier 2012).

    https://doi.org/10.4038/engineer.v45i1.6950

  2. Hemachandra, D. G. / Jayawardane, A. K. W. (2007): Successes and Failures of Sri Lanka Railways in International Technology Transfer. Dans: Engineer: Journal of the Institution of Engineers, Sri Lanka, v. 40, n. 2 (avril 2007).

    https://doi.org/10.4038/engineer.v40i2.7135

  3. Navaratna, Dimuth / Jayawardane, A. K. W. (2007): Total Factor Productivity in the Building Construction Industry in Sri Lanka. Dans: Engineer: Journal of the Institution of Engineers, Sri Lanka, v. 40, n. 1 (janvier 2007).

    https://doi.org/10.4038/engineer.v40i1.7129

  4. Jayawardane, A. K. W. / Price, A. D. F. / Harris, F. C. (1995): Measurement of brickwork and blockwork productivity, Part B. Part B illustrates the procedures for evaluating basic times and balancing gang sizes for various situations in brickwork and blockwork applications. Dans: Building Research & Information, v. 23, n. 3 ( 1995).

    https://doi.org/10.1080/09613219508727448

  5. Jayawardane, A. K. W. / Price, A. D. F. / Harris, F. C. (1995): Measurement of brickwork and blockwork productivity: Part A. Productivity of operations can be improved by accurate estimating, good planning, optimum use of resources and having a sound knowledge of the productivity variables. Dans: Building Research & Information, v. 23, n. 2 ( 1995).

    https://doi.org/10.1080/09613219508727433

  6. Jayawardane, A. K. W. / Price, A. D. F. (1994): A New approach for optimizing earth moving operations [Part 1]. Dans: Proceedings of the Institution of Civil Engineers - Transport, v. 105, n. 3 (août 1994).

    https://doi.org/10.1680/itran.1994.26795

  7. Jayawardane, A. K. W. / Price, A. D. F. (1994): A New Approach for optimizing earth moving operations [Part II]. Dans: Proceedings of the Institution of Civil Engineers - Transport, v. 105, n. 4 (janvier 1994).

    https://doi.org/10.1680/itran.1994.27136

  8. Jayawardane, A. K. W. / Harris, F. C. (1990): Further Development of Integer Programming in Earthwork Optimization. Dans: Journal of Construction Engineering and Management, v. 116, n. 1 (mars 1990).

    https://doi.org/10.1061/(asce)0733-9364(1990)116:1(18)

  9. Jayawardane, A. K. W. / Gunawardena, N. D. (1998): Construction workers in developing countries: a case study of Sri Lanka. Dans: Construction Management and Economics, v. 16, n. 5 (septembre 1998).

    https://doi.org/10.1080/014461998372060

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine