0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

C. William Ibbs

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Fitch, Gregory J. / Odeh, Ibrahim / Ibbs, C. William (2023): Validation of SD Models for the Valuation of Exotic Options in Infrastructure Investment. In: Journal of Infrastructure Systems, v. 29, n. 2 (June 2023).

    https://doi.org/10.1061/jitse4.iseng-2150

  2. Staneff, Stephen T. / Ibbs, C. William / Bea, Robert G. (1995): Risk-Management System for Infrastructure-Condition Assessment. In: Journal of Infrastructure Systems, v. 1, n. 4 (December 1995).

    https://doi.org/10.1061/(asce)1076-0342(1995)1:4(221)

  3. Staneff, Stephen T. / Ibbs, C. William / Oliver, Robert M. (2000): Screening Cycle Decision Modeling for Infrastructure Management. In: Journal of Infrastructure Systems, v. 6, n. 4 (December 2000).

    https://doi.org/10.1061/(asce)1076-0342(2000)6:4(145)

  4. Fitch, Gregory J. / Odeh, Ibrahim / Kautz, Frederick / Ibbs, C. William (2018): System Dynamics Models for the Valuation of Real Options in P3 Concession Project Agreements. In: Journal of Infrastructure Systems, v. 24, n. 1 (March 2018).

    https://doi.org/10.1061/(asce)is.1943-555x.0000409

  5. Kwak, Young Hoon / Ibbs, C. William (2002): Project Management Process Maturity (PM)2 Model. In: Journal of Management in Engineering (ASCE), v. 18, n. 3 (July 2002).

    https://doi.org/10.1061/(asce)0742-597x(2002)18:3(150)

  6. Miller, John B. / Garvin, Michael J. / Ibbs, C. William / Mahoney, Stephen E. (2000): Toward a New Paradigm: Simultaneous Use of Multiple Project Delivery Methods. In: Journal of Management in Engineering (ASCE), v. 16, n. 3 (May 2000).

    https://doi.org/10.1061/(asce)0742-597x(2000)16:3(58)

  7. Ling, Florence Yean Yng / Ibbs, C. William / Chew, Ewen Wei (2008): Strategies Adopted by International Architectural, Engineering, and Construction Firms in Southeast Asia. In: Journal of Professional Issues in Engineering Education and Practice, v. 134, n. 3 (July 2008).

    https://doi.org/10.1061/(asce)1052-3928(2008)134:3(248)

  8. Abu‐Hijleh, Samer F. / Ibbs, C. William (1989): Schedule‐Based Construction Incentives. In: Journal of Construction Engineering and Management, v. 115, n. 3 (September 1989).

    https://doi.org/10.1061/(asce)0733-9364(1989)115:3(430)

  9. Echeverry, Diego / Ibbs, C. William / Kim, Simon (1991): Sequencing Knowledge for Construction Scheduling. In: Journal of Construction Engineering and Management, v. 117, n. 1 (March 1991).

    https://doi.org/10.1061/(asce)0733-9364(1991)117:1(118)

  10. Abu‐Hijleh, Samer F. / Ibbs, C. William (1993): Systematic Automated Management Exception Reporting. In: Journal of Construction Engineering and Management, v. 119, n. 1 (March 1993).

    https://doi.org/10.1061/(asce)0733-9364(1993)119:1(87)

  11. Kim, Jae-Jun / Ibbs, C. William (1995): Work-Package–Process Model for Piping Construction. In: Journal of Construction Engineering and Management, v. 121, n. 4 (December 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:4(381)

  12. Ibbs, C. William (1997): Quantitative Impacts of Project Change: Size Issues. In: Journal of Construction Engineering and Management, v. 123, n. 3 (September 1997).

    https://doi.org/10.1061/(asce)0733-9364(1997)123:3(308)

  13. Ibbs, C. William / Kwak, Young Hoon / Ng, Tzeyu / Odabasi, A. Murat (2003): Project Delivery Systems and Project Change: Quantitative Analysis. In: Journal of Construction Engineering and Management, v. 129, n. 4 (August 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:4(382)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine