-
Ibbs, C. William (1991): Conceptual Approach For Cost/schedule Integration In Project Control Systems. Dans: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1991, n. 425 (janvier 1991).
https://doi.org/10.2208/jscej.1991.1
-
Lee, Eul-Bum / Ibbs, C. William / Thomas, David (2005): Minimizing Total Cost for Urban Freeway Reconstruction with Integrated Construction/Traffic Analysis. Dans: Journal of Infrastructure Systems, v. 11, n. 4 (décembre 2005).
https://doi.org/10.1061/(asce)1076-0342(2005)11:4(250)
-
Ibbs, C. William (1988): Automated construction schedule analysis and evaluation. Présenté pendant: 13th IABSE Congress, Helsinki, Finland, 6-10 June 1988.
https://doi.org/10.5169/seals-13111
-
Chang, T. C. / Ibbs, C. William (1990): Priority ranking—a fuzzy expert system for priority decision making in building construction resource scheduling. Dans: Building and Environment, v. 25, n. 3 (janvier 1990).
https://doi.org/10.1016/0360-1323(90)90051-r
-
Ling, Florence Yean Yng / Ibbs, C. William / Kumaraswamy, Mohan M. (2005): Enablers That Help Foreign Architectural, Engineering, and Construction Firms Win Construction Contracts in China. Dans: Journal of Management in Engineering (ASCE), v. 21, n. 2 (avril 2005).
https://doi.org/10.1061/(asce)0742-597x(2005)21:2(63)
-
Dettbarn, John L. / Ibbs, C. William / Murphree, E. Lile (2005): Capital Project Portfolio Management for Federal Real Property. Dans: Journal of Management in Engineering (ASCE), v. 21, n. 1 (janvier 2005).
https://doi.org/10.1061/(asce)0742-597x(2005)21:1(44)
-
Ibbs, C. William / Wong, Clarence K. / Kwak, Young Hoon (2001): Project Change Management System. Dans: Journal of Management in Engineering (ASCE), v. 17, n. 3 (juillet 2001).
https://doi.org/10.1061/(asce)0742-597x(2001)17:3(159)
-
Chang, Andrew Shing-Tao / Ibbs, C. William (1998): On-Call Contracting Strategy and Management. Dans: Journal of Management in Engineering (ASCE), v. 14, n. 4 (juillet 1998).
https://doi.org/10.1061/(asce)0742-597x(1998)14:4(35)
-
Choi, K. C. / Ibbs, C. William (1990): Costs and Benefits of Computerization in Design and Construction. Dans: Journal of Computing in Civil Engineering, v. 4, n. 1 (janvier 1990).
https://doi.org/10.1061/(asce)0887-3801(1990)4:1(91)
-
Kim, Jae‐Jun / Ibbs, C. William (1992): Comparing Object‐Oriented and Relational Data Models for Project Control. Dans: Journal of Computing in Civil Engineering, v. 6, n. 3 (juillet 1992).
https://doi.org/10.1061/(asce)0887-3801(1992)6:3(348)
-
Songer, Anthony D. / Ibbs, C. William / Garrett, James H. / Napier, Thomas R. / Stumpf, Annette L. (1992): Knowledge‐Based Advisory System for Public‐Sector Design‐Build. Dans: Journal of Computing in Civil Engineering, v. 6, n. 4 (octobre 1992).
https://doi.org/10.1061/(asce)0887-3801(1992)6:4(456)
-
De La Garza, Jesus M. / Ibbs, C. William (1990): Knowledge‐Elicitation Study in Construction Scheduling Domain. Dans: Journal of Computing in Civil Engineering, v. 4, n. 2 (avril 1990).
https://doi.org/10.1061/(asce)0887-3801(1990)4:2(135)
-
Ibbs, C. William / Terveer, Kenneth R. (1984): Integrated Construction Preventive Maintenance System. Dans: Journal of Construction Engineering and Management, v. 110, n. 1 (mars 1984).
https://doi.org/10.1061/(asce)0733-9364(1984)110:1(43)
-
Ibbs, C. William (1986): "Brand Name or Equal" Product Specifications. Dans: Journal of Construction Engineering and Management, v. 112, n. 1 (mars 1986).
https://doi.org/10.1061/(asce)0733-9364(1986)112:1(1)
-
Ibbs, C. William (1985): Product Specification Practices and Problems. Dans: Journal of Construction Engineering and Management, v. 111, n. 2 (juin 1985).
https://doi.org/10.1061/(asce)0733-9364(1985)111:2(157)
-
Ibbs, C. William (1986): Future Directions for Computerized Construction Research. Dans: Journal of Construction Engineering and Management, v. 112, n. 3 (septembre 1986).
https://doi.org/10.1061/(asce)0733-9364(1986)112:3(326)
-
Ibbs, C. William / Bates, Leslie C. / Echeverry, Diego (1987): Owner‐Furnished Equipment (OFE) Contract Practices. Dans: Journal of Construction Engineering and Management, v. 113, n. 2 (juin 1987).
https://doi.org/10.1061/(asce)0733-9364(1987)113:2(249)
-
Echeverry, Diego / Ibbs, C. William / Burati, James (1988): Graduated Unit Price Payment Schedules. Dans: Journal of Construction Engineering and Management, v. 114, n. 1 (mars 1988).
https://doi.org/10.1061/(asce)0733-9364(1988)114:1(1)
-
Ibbs, C. William / Ashley, David B. (1987): Impact of Various Construction Contract Clauses. Dans: Journal of Construction Engineering and Management, v. 113, n. 3 (septembre 1987).
https://doi.org/10.1061/(asce)0733-9364(1987)113:3(501)
-
Chang, T. C. / Ibbs, C. William / Crandall, Keith C. (1990): Network Resource Allocation with Support of a Fuzzy Expert System. Dans: Journal of Construction Engineering and Management, v. 116, n. 2 (juin 1990).
https://doi.org/10.1061/(asce)0733-9364(1990)116:2(239)
-
Songer, Anthony D. / Ibbs, C. William / Napier, Thomas R. (1994): Process Model for Public Sector Design‐Build Planning. Dans: Journal of Construction Engineering and Management, v. 120, n. 4 (décembre 1994).
https://doi.org/10.1061/(asce)0733-9364(1994)120:4(857)
-
Lee, Eul-Bum / Roesler, Jeff / Harvey, John T. / Ibbs, C. William (2002): Case Study of Urban Concrete Pavement Reconstruction on Interstate 10. Dans: Journal of Construction Engineering and Management, v. 128, n. 1 (février 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:1(49)
-
Lim, Benson T. H. / Ling, Florence Y. Y. / Ibbs, C. William / Raphael, Benny / Ofori, George (2011): Empirical Analysis of the Determinants of Organizational Flexibility in the Construction Business. Dans: Journal of Construction Engineering and Management, v. 137, n. 3 (mars 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000272
-
Lim, Benson T. H. / Ling, Florence Y. Y. / Ibbs, C. William / Raphael, Benny / Ofori, George (2012): Mathematical Models for Predicting Organizational Flexibility of Construction Firms in Singapore. Dans: Journal of Construction Engineering and Management, v. 138, n. 3 (mars 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000439
-
Ling, Florence Yean / Ibbs, C. William / Hoo, Wei Yee (2006): Determinants of International Architectural, Engineering, and Construction Firms' Project Success in China. Dans: Journal of Construction Engineering and Management, v. 132, n. 2 (février 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:2(206)
-
Fitch, Gregory J. / Odeh, Ibrahim / Ibbs, C. William (2015): Economic Sustainability of DBO Water Based on Wastewater Projects in the U.S.: Three Case Studies. Dans: Journal of Construction Engineering and Management, v. 141, n. 5 (mai 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0000967
-
Kartam, Saied / Ballard, Glenn / Ibbs, C. William (1997): Introducing a New Concept and Approach to Modeling Construction. Dans: Journal of Construction Engineering and Management, v. 123, n. 1 (mars 1997).
https://doi.org/10.1061/(asce)0733-9364(1997)123:1(89)
-
Ling, Florence Yean Yng / Ibbs, C. William / Cuervo, Javier C. (2005): Entry and business strategies used by international architectural, engineering and construction firms in China. Dans: Construction Management and Economics, v. 23, n. 5 (juin 2005).
https://doi.org/10.1080/01446190500040141
-
Choi, Kunhee / Lee, Eul‐Bum / Ibbs, C. William / Kim, Yong-Woo (2009): Multifaceted public outreach and cost–benefit analysis for its effectiveness validation. Dans: Construction Management and Economics, v. 27, n. 8 (août 2009).
https://doi.org/10.1080/01446190903096591
-
Ibbs, C. William (1991): Innovative contract incentive features for construction. Dans: Construction Management and Economics, v. 9, n. 2 (avril 1991).
https://doi.org/10.1080/01446199100000014