0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Changtaek Hyun

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Jin, Chengquan / Lee, Yeongchan / Lee, SangHoon / Hyun, Changtaek (2024): Lightweighting Process of Digital Twin Information Models for Smart City Services. In: KSCE Journal of Civil Engineering, v. 28, n. 4 (January 2024).

    https://doi.org/10.1007/s12205-024-2354-z

  2. Kang, Youngcheol / Jin, Zhengxun / Hyun, Changtaek / Park, Hyeon (2018): Construction Management Functions for Developing Countries: Case of Cambodia. In: Journal of Management in Engineering (ASCE), v. 34, n. 3 (May 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000609

  3. Moon, HyunSeok / Hyun, Changtaek / Hong, Taehoon (2014): Prediction Model of CO2 Emission for Residential Buildings in South Korea. In: Journal of Management in Engineering (ASCE), v. 30, n. 3 (May 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000228

  4. Moon, HyunSeok / Cho, Kyuman / Hong, Taehoon / Hyun, Changtaek (2011): Selection Model for Delivery Methods for Multifamily-Housing Construction Projects. In: Journal of Management in Engineering (ASCE), v. 27, n. 2 (April 2011).

    https://doi.org/10.1061/(asce)me.1943-5479.0000038

  5. Ji, Changyoon / Hong, Taehoon / Hyun, Changtaek (2010): CBR Revision Model for Improving Cost Prediction Accuracy in Multifamily Housing Projects. In: Journal of Management in Engineering (ASCE), v. 26, n. 4 (October 2010).

    https://doi.org/10.1061/(asce)me.1943-5479.0000018

  6. Cho, Kyuman / Hong, Taehoon / Hyun, Changtaek (2010): Integrated Schedule and Cost Model for Repetitive Construction Process. In: Journal of Management in Engineering (ASCE), v. 26, n. 2 (April 2010).

    https://doi.org/10.1061/(asce)me.1943-5479.0000009

  7. Cho, Kyuman / Hyun, Changtaek / Koo, KyoJin / Hong, Taehoon (2010): Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea. In: Journal of Management in Engineering (ASCE), v. 26, n. 1 (January 2010).

    https://doi.org/10.1061/(asce)0742-597x(2010)26:1(19)

  8. Yoon, Yousang / Jung, Jinho / Hyun, Changtaek (2016): Decision-making Support Systems Using Case-based Reasoning for Construction Project Delivery Method Selection: Focused on the Road Construction Projects in Korea. In: The Open Civil Engineering Journal, v. 10, n. 1 (December 2016).

    https://doi.org/10.2174/1874149501610010500

  9. An, Soobae / Ji, Soungmin / Hyun, Changtaek / Han, Sangwon (2015): A model-based productivity improvement of reinforced concrete work in a multi-housing project. In: KSCE Journal of Civil Engineering, v. 19, n. 5 (February 2015).

    https://doi.org/10.1007/s12205-015-0302-7

  10. Hyun, Changtaek / Cho, Kyuman / Koo, KyoJin / Hong, Taehoon / Moon, HyunSeok (2008): Effect of Delivery Methods on Design Performance in Multifamily Housing Projects. In: Journal of Construction Engineering and Management, v. 134, n. 7 (July 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:7(468)

  11. Hong, Taehoon / Cho, Kyuman / Hyun, Changtaek / Han, Seungwoo (2011): Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building. In: Journal of Construction Engineering and Management, v. 137, n. 6 (June 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000300

  12. Lee, Seunghoon / Hyun, Changtaek / Hong, Taehoon (2009): RETRIEVE: REmembering Tool for Reusing the Ideas Evolved in Value Engineering. In: Automation in Construction, v. 18, n. 8 (December 2009).

    https://doi.org/10.1016/j.autcon.2009.07.004

  13. Jin, RunZhi / Han, Sangwon / Hyun, Changtaek / Cha, Yongwoon (2016): Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects. In: Journal of Construction Engineering and Management, v. 142, n. 2 (February 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001072

  14. Cho, Kyuman / Hong, Taehoon / Hyun, Changtaek (2011): Scheduling model for repetitive construction processes for high-rise buildings. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 1 (January 2011).

    https://doi.org/10.1139/l10-108

  15. Koo, ChoongWan / Hong, Taehoon / Hyun, Changtaek / Koo, KyoJin (2010): A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 37, n. 5 (May 2010).

    https://doi.org/10.1139/l10-007

  16. Kim, Jonghyeob / Han, Sangwon / Hyun, Changtaek (2016): Minimizing Fluctuation of the Maintenance, Repair, and Rehabilitation Cost Profile of a Building. In: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 3 (June 2016).

    https://doi.org/10.1061/(asce)cf.1943-5509.0000775

  17. Jin, RunZhi / Han, Sangwon / Hyun, Changtaek / Kim, JiHoon (2014): Improving Accuracy of Early Stage Cost Estimation by Revising Categorical Variables in a Case-Based Reasoning Model. In: Journal of Construction Engineering and Management, v. 140, n. 7 (July 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000863

  18. Hyun, Changtaek / Jin, Chengquan / Shen, Zhenhua / Kim, Hyunjoo (2018): Automated optimization of formwork design through spatial analysis in building information modeling. In: Automation in Construction, v. 95 (November 2018).

    https://doi.org/10.1016/j.autcon.2018.07.023

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine