Changtaek Hyun
- Lightweighting Process of Digital Twin Information Models for Smart City Services. In: KSCE Journal of Civil Engineering, v. 28, n. 4 (Januar 2024). (2024):
- Construction Management Functions for Developing Countries: Case of Cambodia. In: Journal of Management in Engineering (ASCE), v. 34, n. 3 (Mai 2018). (2018):
- Prediction Model of CO2 Emission for Residential Buildings in South Korea. In: Journal of Management in Engineering (ASCE), v. 30, n. 3 (Mai 2014). (2014):
- Selection Model for Delivery Methods for Multifamily-Housing Construction Projects. In: Journal of Management in Engineering (ASCE), v. 27, n. 2 (April 2011). (2011):
- CBR Revision Model for Improving Cost Prediction Accuracy in Multifamily Housing Projects. In: Journal of Management in Engineering (ASCE), v. 26, n. 4 (Oktober 2010). (2010):
- Integrated Schedule and Cost Model for Repetitive Construction Process. In: Journal of Management in Engineering (ASCE), v. 26, n. 2 (April 2010). (2010):
- Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea. In: Journal of Management in Engineering (ASCE), v. 26, n. 1 (Januar 2010). (2010):
- Decision-making Support Systems Using Case-based Reasoning for Construction Project Delivery Method Selection: Focused on the Road Construction Projects in Korea. In: The Open Civil Engineering Journal, v. 10, n. 1 (Dezember 2016). (2016):
- A model-based productivity improvement of reinforced concrete work in a multi-housing project. In: KSCE Journal of Civil Engineering, v. 19, n. 5 (Februar 2015). (2015):
- Effect of Delivery Methods on Design Performance in Multifamily Housing Projects. In: Journal of Construction Engineering and Management, v. 134, n. 7 (Juli 2008). (2008):
- Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building. In: Journal of Construction Engineering and Management, v. 137, n. 6 (Juni 2011). (2011):
- RETRIEVE: REmembering Tool for Reusing the Ideas Evolved in Value Engineering. In: Automation in Construction, v. 18, n. 8 (Dezember 2009). (2009):
- Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects. In: Journal of Construction Engineering and Management, v. 142, n. 2 (Februar 2016). (2016):
- Scheduling model for repetitive construction processes for high-rise buildings. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 1 (Januar 2011). (2011):
- A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 37, n. 5 (Mai 2010). (2010):
- Minimizing Fluctuation of the Maintenance, Repair, and Rehabilitation Cost Profile of a Building. In: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 3 (Juni 2016). (2016):
- Improving Accuracy of Early Stage Cost Estimation by Revising Categorical Variables in a Case-Based Reasoning Model. In: Journal of Construction Engineering and Management, v. 140, n. 7 (Juli 2014). (2014):
- Automated optimization of formwork design through spatial analysis in building information modeling. In: Automation in Construction, v. 95 (November 2018). (2018):