0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Gong, J. W. / Li, Y. P. / Huang, G. H. / Li, Y. F. (2022): Interval-parameter bi-level programming for energy system management under uncertainty: Towards a deep-decarbonized and sustainable future in China. In: Sustainable Cities and Society, v. 87 (December 2022).

    https://doi.org/10.1016/j.scs.2022.104258

  2. Wang, Z.-Y. / Huang, G. H. / Wang, G. Q. / Gao, J. (2004): Modeling of Vegetation-Erosion Dynamics in Watershed Systems. In: Journal of Environmental Engineering (ASCE), v. 130, n. 7 (July 2004).

    https://doi.org/10.1061/(asce)0733-9372(2004)130:7(792)

  3. Chen, Z. / Huang, G. H. (2003): Integrated Subsurface Modeling and Risk Assessment of Petroleum-Contaminated Sites in Western Canada. In: Journal of Environmental Engineering (ASCE), v. 129, n. 9 (September 2003).

    https://doi.org/10.1061/(asce)0733-9372(2003)129:9(858)

  4. Chen, Z. / Huang, G. H. / Chakma, A. (2003): Hybrid Fuzzy-Stochastic Modeling Approach for Assessing Environmental Risks at Contaminated Groundwater Systems. In: Journal of Environmental Engineering (ASCE), v. 129, n. 1 (January 2003).

    https://doi.org/10.1061/(asce)0733-9372(2003)129:1(79)

  5. Li, Y. P. / Huang, G. H. (2011): Integrated Modeling for Optimal Municipal Solid Waste Management Strategies under Uncertainty. In: Journal of Environmental Engineering (ASCE), v. 137, n. 9 (September 2011).

    https://doi.org/10.1061/(asce)ee.1943-7870.0000393

  6. Du, P. / Li, Y. P. / Huang, G. H. (2013): Inexact Chance-Constrained Waste-Load Allocation Model for Water Quality Management of Xiangxihe River. In: Journal of Environmental Engineering (ASCE), v. 139, n. 9 (September 2013).

    https://doi.org/10.1061/(asce)ee.1943-7870.0000724

  7. Zhai, Y. Y. / Huang, G. H. / Zhou, Y. / Zhou, X. (2016): A Factorial Dual-Interval Programming Approach for Planning Municipal Waste Management Systems. In: Journal of Environmental Engineering (ASCE), v. 142, n. 8 (August 2016).

    https://doi.org/10.1061/(asce)ee.1943-7870.0001102

  8. Lin, Q. G. / Huang, G. H. / Huang, Y. F. / Zhang, X. D. (2010): Inexact Community-Scale Energy Systems Planning Model. In: Journal of Urban Planning and Development, v. 136, n. 3 (September 2010).

    https://doi.org/10.1061/(asce)up.1943-5444.0000017

  9. Zhang, L. Z. / He, L. / Huang, G. H. / Zhu, Y. (2013): Integrated Regional Renewable and Nonrenewable Energy Policies Identified through Interval Stochastic Semi-Infinite Programming. In: Journal of Energy Engineering, v. 139, n. 2 (June 2013).

    https://doi.org/10.1061/(asce)ey.1943-7897.0000099

  10. Wang, X. / Yang, Z. F. / Huang, G. H. (2005): High-Order Compact Difference Scheme for Convection–Diffusion Problems on Nonuniform Grids. In: Journal of Engineering Mechanics (ASCE), v. 131, n. 12 (December 2005).

    https://doi.org/10.1061/(asce)0733-9399(2005)131:12(1221)

  11. Li, Y. P. / Huang, G. H. (2010): Dual-Interval Fuzzy Stochastic Programming Method for Long-Term Planning of Municipal Solid Waste Management. In: Journal of Computing in Civil Engineering, v. 24, n. 2 (March 2010).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000025

  12. Fan, Y. R. / Huang, G. H. / Jin, L. / Suo, M. Q. (2014): Solid waste management under uncertainty: a generalized fuzzy linear programming approach. In: Civil Engineering and Environmental Systems, v. 31, n. 4 (August 2014).

    https://doi.org/10.1080/10286608.2014.913031

  13. Xu, Y. / Huang, G. H. / Shao, L. G. (2014): A solid waste management model with fuzzy random parameters. In: Civil Engineering and Environmental Systems, v. 31, n. 1 (January 2014).

    https://doi.org/10.1080/10286608.2013.853744

  14. Huang, Y. / Huang, G. H. / Hu, Q. (2012): A fuzzy-parameterised stochastic modelling system for predicting multiphase subsurface transport under dual uncertainties. In: Civil Engineering and Environmental Systems, v. 29, n. 2 (June 2012).

    https://doi.org/10.1080/10286608.2012.663355

  15. Li, Y. P. / Huang, G. H. / Zhang, N. / Mo, D. W. / Nie, S. L. (2010): ISIP: capacity planning for flood management systems under uncertainty. In: Civil Engineering and Environmental Systems, v. 27, n. 1 (March 2010).

    https://doi.org/10.1080/10286600802284373

  16. Huang, G. H. / Qin, X. S. / Sun, W. / Nie, X. H. / Li, Y. P. (2009): An optimisation-based environmental decision support system for sustainable development in a rural area in China. In: Civil Engineering and Environmental Systems, v. 26, n. 1 (March 2009).

    https://doi.org/10.1080/10286600802003732

  17. Li, Y. P. / Huang, G. H. / Liu, Y. Y. / Zhang, Y. M. / Nie, S. L. (2008): An inexact stochastic quadratic programming method for municipal solid waste management. In: Civil Engineering and Environmental Systems, v. 25, n. 2 (June 2008).

    https://doi.org/10.1080/10286600801908949

  18. Huang, G. H. / Qin, X. S. (2008): Environmental systems analysis under uncertainty. In: Civil Engineering and Environmental Systems, v. 25, n. 2 (June 2008).

    https://doi.org/10.1080/10485250801908868

  19. Nie, X. H. / Huang, G. H. / Wang, D. / Li, H. L. (2008): Robust optimisation for inexact water quality management under uncertainty. In: Civil Engineering and Environmental Systems, v. 25, n. 2 (June 2008).

    https://doi.org/10.1080/10286600801908964

  20. Li, Y. P. / Huang, G. H. / Nie, S. L. / Huang, Y. F. (2006): IFTSIP: interval fuzzy two-stage stochastic mixed-integer linear programming: a case study for environmental management and planning. In: Civil Engineering and Environmental Systems, v. 23, n. 2 (June 2006).

    https://doi.org/10.1080/10286600600679477

  21. Maqsood, I. / Huang, G. H. / Zeng, G. M. (2004): An inexact two-stage mixed integer linear programming model for waste management under uncertainty. In: Civil Engineering and Environmental Systems, v. 21, n. 3 (September 2004).

    https://doi.org/10.1080/10286600410001730698

  22. Huang, G. H. / Loucks, D. P. (2000): An Inexact Two-stage Stochastic Programming Model for Water Resources Management Under Uncertainty. In: Civil Engineering and Environmental Systems, v. 17, n. 2 (May 2000).

    https://doi.org/10.1080/02630250008970277

  23. Li, Y. P. / Huang, G. H. (2009): Interval-parameter robust optimization for environmental management under uncertainty. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 4 (April 2009).

    https://doi.org/10.1139/l08-131

  24. He, L. / Huang, G. H. (2008): Optimization of regional waste management systems based on inexact semi-infinite programming. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 9 (September 2008).

    https://doi.org/10.1139/l08-037

  25. Li, Y. P. / Huang, G. H. / Yang, Z. F. / Nie, S. L. (2009): 0-1 Piecewise linearization approach for interval-parameter nonlinear programming:  application to environmental management under uncertainty. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 6 (June 2009).

    https://doi.org/10.1139/l09-038

  26. Huang, G. H. / Baetz, B. W. / Patry, G. G. (1996): A grey hop, skip, and jump approach: generating alternatives for expansion planning of waste management facilities. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 23, n. 6 (December 1996).

    https://doi.org/10.1139/l96-930

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine