-
Gong, J. W. / Li, Y. P. / Huang, G. H. / Li, Y. F. (2022): Interval-parameter bi-level programming for energy system management under uncertainty: Towards a deep-decarbonized and sustainable future in China. In: Sustainable Cities and Society, v. 87 (Dezember 2022).
https://doi.org/10.1016/j.scs.2022.104258
-
Wang, Z.-Y. / Huang, G. H. / Wang, G. Q. / Gao, J. (2004): Modeling of Vegetation-Erosion Dynamics in Watershed Systems. In: Journal of Environmental Engineering (ASCE), v. 130, n. 7 (Juli 2004).
https://doi.org/10.1061/(asce)0733-9372(2004)130:7(792)
-
Chen, Z. / Huang, G. H. (2003): Integrated Subsurface Modeling and Risk Assessment of Petroleum-Contaminated Sites in Western Canada. In: Journal of Environmental Engineering (ASCE), v. 129, n. 9 (September 2003).
https://doi.org/10.1061/(asce)0733-9372(2003)129:9(858)
-
Chen, Z. / Huang, G. H. / Chakma, A. (2003): Hybrid Fuzzy-Stochastic Modeling Approach for Assessing Environmental Risks at Contaminated Groundwater Systems. In: Journal of Environmental Engineering (ASCE), v. 129, n. 1 (Januar 2003).
https://doi.org/10.1061/(asce)0733-9372(2003)129:1(79)
-
Li, Y. P. / Huang, G. H. (2011): Integrated Modeling for Optimal Municipal Solid Waste Management Strategies under Uncertainty. In: Journal of Environmental Engineering (ASCE), v. 137, n. 9 (September 2011).
https://doi.org/10.1061/(asce)ee.1943-7870.0000393
-
Du, P. / Li, Y. P. / Huang, G. H. (2013): Inexact Chance-Constrained Waste-Load Allocation Model for Water Quality Management of Xiangxihe River. In: Journal of Environmental Engineering (ASCE), v. 139, n. 9 (September 2013).
https://doi.org/10.1061/(asce)ee.1943-7870.0000724
-
Zhai, Y. Y. / Huang, G. H. / Zhou, Y. / Zhou, X. (2016): A Factorial Dual-Interval Programming Approach for Planning Municipal Waste Management Systems. In: Journal of Environmental Engineering (ASCE), v. 142, n. 8 (August 2016).
https://doi.org/10.1061/(asce)ee.1943-7870.0001102
-
Lin, Q. G. / Huang, G. H. / Huang, Y. F. / Zhang, X. D. (2010): Inexact Community-Scale Energy Systems Planning Model. In: Journal of Urban Planning and Development, v. 136, n. 3 (September 2010).
https://doi.org/10.1061/(asce)up.1943-5444.0000017
-
Zhang, L. Z. / He, L. / Huang, G. H. / Zhu, Y. (2013): Integrated Regional Renewable and Nonrenewable Energy Policies Identified through Interval Stochastic Semi-Infinite Programming. In: Journal of Energy Engineering, v. 139, n. 2 (Juni 2013).
https://doi.org/10.1061/(asce)ey.1943-7897.0000099
-
Wang, X. / Yang, Z. F. / Huang, G. H. (2005): High-Order Compact Difference Scheme for Convection–Diffusion Problems on Nonuniform Grids. In: Journal of Engineering Mechanics (ASCE), v. 131, n. 12 (Dezember 2005).
https://doi.org/10.1061/(asce)0733-9399(2005)131:12(1221)
-
Li, Y. P. / Huang, G. H. (2010): Dual-Interval Fuzzy Stochastic Programming Method for Long-Term Planning of Municipal Solid Waste Management. In: Journal of Computing in Civil Engineering, v. 24, n. 2 (März 2010).
https://doi.org/10.1061/(asce)cp.1943-5487.0000025
-
Fan, Y. R. / Huang, G. H. / Jin, L. / Suo, M. Q. (2014): Solid waste management under uncertainty: a generalized fuzzy linear programming approach. In: Civil Engineering and Environmental Systems, v. 31, n. 4 (August 2014).
https://doi.org/10.1080/10286608.2014.913031
-
Xu, Y. / Huang, G. H. / Shao, L. G. (2014): A solid waste management model with fuzzy random parameters. In: Civil Engineering and Environmental Systems, v. 31, n. 1 (Januar 2014).
https://doi.org/10.1080/10286608.2013.853744
-
Huang, Y. / Huang, G. H. / Hu, Q. (2012): A fuzzy-parameterised stochastic modelling system for predicting multiphase subsurface transport under dual uncertainties. In: Civil Engineering and Environmental Systems, v. 29, n. 2 (Juni 2012).
https://doi.org/10.1080/10286608.2012.663355
-
Li, Y. P. / Huang, G. H. / Zhang, N. / Mo, D. W. / Nie, S. L. (2010): ISIP: capacity planning for flood management systems under uncertainty. In: Civil Engineering and Environmental Systems, v. 27, n. 1 (März 2010).
https://doi.org/10.1080/10286600802284373
-
Huang, G. H. / Qin, X. S. / Sun, W. / Nie, X. H. / Li, Y. P. (2009): An optimisation-based environmental decision support system for sustainable development in a rural area in China. In: Civil Engineering and Environmental Systems, v. 26, n. 1 (März 2009).
https://doi.org/10.1080/10286600802003732
-
Li, Y. P. / Huang, G. H. / Liu, Y. Y. / Zhang, Y. M. / Nie, S. L. (2008): An inexact stochastic quadratic programming method for municipal solid waste management. In: Civil Engineering and Environmental Systems, v. 25, n. 2 (Juni 2008).
https://doi.org/10.1080/10286600801908949
-
Huang, G. H. / Qin, X. S. (2008): Environmental systems analysis under uncertainty. In: Civil Engineering and Environmental Systems, v. 25, n. 2 (Juni 2008).
https://doi.org/10.1080/10485250801908868
-
Nie, X. H. / Huang, G. H. / Wang, D. / Li, H. L. (2008): Robust optimisation for inexact water quality management under uncertainty. In: Civil Engineering and Environmental Systems, v. 25, n. 2 (Juni 2008).
https://doi.org/10.1080/10286600801908964
-
Li, Y. P. / Huang, G. H. / Nie, S. L. / Huang, Y. F. (2006): IFTSIP: interval fuzzy two-stage stochastic mixed-integer linear programming: a case study for environmental management and planning. In: Civil Engineering and Environmental Systems, v. 23, n. 2 (Juni 2006).
https://doi.org/10.1080/10286600600679477
-
Maqsood, I. / Huang, G. H. / Zeng, G. M. (2004): An inexact two-stage mixed integer linear programming model for waste management under uncertainty. In: Civil Engineering and Environmental Systems, v. 21, n. 3 (September 2004).
https://doi.org/10.1080/10286600410001730698
-
Huang, G. H. / Loucks, D. P. (2000): An Inexact Two-stage Stochastic Programming Model for Water Resources Management Under Uncertainty. In: Civil Engineering and Environmental Systems, v. 17, n. 2 (Mai 2000).
https://doi.org/10.1080/02630250008970277
-
Li, Y. P. / Huang, G. H. (2009): Interval-parameter robust optimization for environmental management under uncertainty. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 4 (April 2009).
https://doi.org/10.1139/l08-131
-
He, L. / Huang, G. H. (2008): Optimization of regional waste management systems based on inexact semi-infinite programming. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 9 (September 2008).
https://doi.org/10.1139/l08-037
-
Li, Y. P. / Huang, G. H. / Yang, Z. F. / Nie, S. L. (2009): 0-1 Piecewise linearization approach for interval-parameter nonlinear programming: application to environmental management under uncertainty. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 6 (Juni 2009).
https://doi.org/10.1139/l09-038
-
Huang, G. H. / Baetz, B. W. / Patry, G. G. (1996): A grey hop, skip, and jump approach: generating alternatives for expansion planning of waste management facilities. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 23, n. 6 (Dezember 1996).
https://doi.org/10.1139/l96-930