X. Hu
- (2021): Application of Under-pinning Pipe Jacking on Tunnel Auxiliary Construction. In: IOP Conference Series: Earth and Environmental Science, v. 861, n. 3 (1 October 2021).
- Considering buried depth in the moving finite line source model for vertical borehole heat exchangers—A new solution. In: Energy and Buildings, v. 214 (May 2020). (2020):
- Flüssigkeitserosion und Hydroabrasivverschleiß von Stahlfaserbeton. In: Beton- und Stahlbetonbau, v. 98, n. 12 (December 2003). (2003):