X. Hu
- (2021): Application of Under-pinning Pipe Jacking on Tunnel Auxiliary Construction. Dans: IOP Conference Series: Earth and Environmental Science, v. 861, n. 3 (1 octobre 2021).
- Considering buried depth in the moving finite line source model for vertical borehole heat exchangers—A new solution. Dans: Energy and Buildings, v. 214 (mai 2020). (2020):
- Flüssigkeitserosion und Hydroabrasivverschleiß von Stahlfaserbeton. Dans: Beton- und Stahlbetonbau, v. 98, n. 12 (décembre 2003). (2003):