0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Liao, Mu-Chun / Hsieh, Ting-Ya / Wang, Wei-Hsiang: Management of gross negligence manslaughter liability construction for professionals and lessons learned. In: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-11-2022-1059

  2. Liao, Mu-Chun / Hsieh, Ting-Ya (2022): Violations of Professional Technical Standards: Causes and Lessons Learned. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 14, n. 1 (February 2022).

    https://doi.org/10.1061/(asce)la.1943-4170.0000482

  3. Hsieh, Ting-Ya / Liu, Hsin-Lung (1997): Multistage Heuristic Approach for Solving Infrastructure Investment Decision Problems. In: Journal of Infrastructure Systems, v. 3, n. 4 (December 1997).

    https://doi.org/10.1061/(asce)1076-0342(1997)3:4(134)

  4. Yeh, Huei-Huang / Hsieh, Ting-Ya / Chen, Jieh-Haur / Peng, Hsin-Tsang (2020): Preventive Interface Management for Design-Build Wireless Train Control Mass Rapid Transit Projects. In: Journal of Performance of Constructed Facilities (ASCE), v. 34, n. 1 (February 2020).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001337

  5. Hsu, Ko-Ming / Hsieh, Ting-Ya / Chen, Jieh-Haur (2015): Legal risks incurred under the application of BIM in Taiwan. In: Proceedings of the Institution of Civil Engineers - Forensic Engineering, v. 168, n. 3 (August 2015).

    https://doi.org/10.1680/feng.14.00005

  6. Yeh, Huei-Huang / Hsieh, Ting-Ya / Chen, Jieh-Haur (2017): Managing Complex Engineering Interfaces of Urban Mass Rapid Transit Projects. In: Journal of Construction Engineering and Management, v. 143, n. 6 (June 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001283

  7. Hsieh, Ting-Ya / Liu, Hsin-Lung (2004): Genetic Algorithm for Optimization of Infrastructure Investment Under Time-Resource Constraints. In: Computer-Aided Civil and Infrastructure Engineering, v. 19, n. 3 (May 2004).

    https://doi.org/10.1111/j.1467-8667.2004.00348.x

  8. Hsieh, Ting-Ya / Haas, Carl (1994): Determining functional requirements for large scale manipulators. In: Automation in Construction, v. 3, n. 1 (May 1994).

    https://doi.org/10.1016/0926-5805(94)90032-9

  9. Hsieh, Ting-Ya (1997): The economic implications of subcontracting practice on building prefabrication. In: Automation in Construction, v. 6, n. 3 (June 1997).

    https://doi.org/10.1016/s0926-5805(97)00001-0

  10. Wu, Ming-Chang / Tung, Pi-Cheng / Hsieh, Ting-Ya (2002): Improvement of the horizontal directional drilling method by using an autonomous land vehicle with a radio direction finding system. In: Automation in Construction, v. 11, n. 1 (January 2002).

    https://doi.org/10.1016/s0926-5805(01)00054-1

  11. Yau, Nie-Jia / Yang, Jyh-Bin / Hsieh, Ting-Ya (1999): Inducing rules for selecting retaining wall systems. In: Construction Management and Economics, v. 17, n. 1 (January 1999).

    https://doi.org/10.1080/014461999371853

  12. Hsieh, Ting-Ya (1998): Impact of Subcontracting on Site Productivity: Lessons Learned in Taiwan. In: Journal of Construction Engineering and Management, v. 124, n. 2 (March 1998).

    https://doi.org/10.1061/(asce)0733-9364(1998)124:2(91)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine