0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Liao, Mu-Chun / Hsieh, Ting-Ya / Wang, Wei-Hsiang: Management of gross negligence manslaughter liability construction for professionals and lessons learned. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-11-2022-1059

  2. Liao, Mu-Chun / Hsieh, Ting-Ya (2022): Violations of Professional Technical Standards: Causes and Lessons Learned. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 14, n. 1 (février 2022).

    https://doi.org/10.1061/(asce)la.1943-4170.0000482

  3. Hsieh, Ting-Ya / Liu, Hsin-Lung (1997): Multistage Heuristic Approach for Solving Infrastructure Investment Decision Problems. Dans: Journal of Infrastructure Systems, v. 3, n. 4 (décembre 1997).

    https://doi.org/10.1061/(asce)1076-0342(1997)3:4(134)

  4. Yeh, Huei-Huang / Hsieh, Ting-Ya / Chen, Jieh-Haur / Peng, Hsin-Tsang (2020): Preventive Interface Management for Design-Build Wireless Train Control Mass Rapid Transit Projects. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 34, n. 1 (février 2020).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001337

  5. Hsu, Ko-Ming / Hsieh, Ting-Ya / Chen, Jieh-Haur (2015): Legal risks incurred under the application of BIM in Taiwan. Dans: Proceedings of the Institution of Civil Engineers - Forensic Engineering, v. 168, n. 3 (août 2015).

    https://doi.org/10.1680/feng.14.00005

  6. Yeh, Huei-Huang / Hsieh, Ting-Ya / Chen, Jieh-Haur (2017): Managing Complex Engineering Interfaces of Urban Mass Rapid Transit Projects. Dans: Journal of Construction Engineering and Management, v. 143, n. 6 (juin 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001283

  7. Hsieh, Ting-Ya / Liu, Hsin-Lung (2004): Genetic Algorithm for Optimization of Infrastructure Investment Under Time-Resource Constraints. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 19, n. 3 (mai 2004).

    https://doi.org/10.1111/j.1467-8667.2004.00348.x

  8. Hsieh, Ting-Ya / Haas, Carl (1994): Determining functional requirements for large scale manipulators. Dans: Automation in Construction, v. 3, n. 1 (mai 1994).

    https://doi.org/10.1016/0926-5805(94)90032-9

  9. Hsieh, Ting-Ya (1997): The economic implications of subcontracting practice on building prefabrication. Dans: Automation in Construction, v. 6, n. 3 (juin 1997).

    https://doi.org/10.1016/s0926-5805(97)00001-0

  10. Wu, Ming-Chang / Tung, Pi-Cheng / Hsieh, Ting-Ya (2002): Improvement of the horizontal directional drilling method by using an autonomous land vehicle with a radio direction finding system. Dans: Automation in Construction, v. 11, n. 1 (janvier 2002).

    https://doi.org/10.1016/s0926-5805(01)00054-1

  11. Yau, Nie-Jia / Yang, Jyh-Bin / Hsieh, Ting-Ya (1999): Inducing rules for selecting retaining wall systems. Dans: Construction Management and Economics, v. 17, n. 1 (janvier 1999).

    https://doi.org/10.1080/014461999371853

  12. Hsieh, Ting-Ya (1998): Impact of Subcontracting on Site Productivity: Lessons Learned in Taiwan. Dans: Journal of Construction Engineering and Management, v. 124, n. 2 (mars 1998).

    https://doi.org/10.1061/(asce)0733-9364(1998)124:2(91)

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine