  1. El Hakea, Ayman H. / Sami, Mahmoud / Badawy, Abdelhay / Elbeltagi, Emad / Hosny, Ossama / Iskander, Moheb / Abu-Samra, Soliman (2024): Risk-Based Self-Improving Asset Management Framework for Coastal Protection Structures Using 1+ Inspection Points. In: Journal of Performance of Constructed Facilities (ASCE), v. 38, n. 3 (June 2024).

    https://doi.org/10.1061/jpcfev.cfeng-4633

  2. Elazhary, Mariam / Hosny, Ossama (2024): Automated Management of Time Extension Claims. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 16, n. 2 (May 2024).

    https://doi.org/10.1061/jladah.ladr-1104

  3. Alqahtani, Fahad K. / Sherif, Mohamed / Abotaleb, Ibrahim S. / Hosny, Ossama / Nassar, Khaled / Gouda Mohamed, Ahmed (2023): Integrated design optimization framework for green lightweight concrete. In: Journal of Building Engineering, v. 73 (August 2023).

    https://doi.org/10.1016/j.jobe.2023.106838

  4. Gharib, Shrouk / Hosny, Ossama / Waly, Ahmed / Abotaleb, Ibrahim (2023): System Dynamics as an Assistive Tool to Delay Analysis in Identifying Productivity Losses. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 3 (August 2023).

    https://doi.org/10.1061/jladah.ladr-948

  5. Elazhary, Mariam / Hosny, Ossama (2023): Framework for the Application of Blockchain Technology to Delay Analysis. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 2 (May 2023).

    https://doi.org/10.1061/jladah.ladr-863

  6. Badawy, Abdelhay / Hosny, Ossama / Elbehairy, Hatem / Dorra, Elkhayam M. (2022): Development of an Assessment and Prediction Framework for Bridge Expansion Joints. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 49, n. 8 (1 August 2022).

    https://doi.org/10.1139/cjce-2019-0572

  7. Hosny, Ossama / Nassar, Khaled / Esmail, Yasser (2013): Prequalification of Egyptian construction contractors using fuzzy‐AHP models. In: Engineering, Construction and Architectural Management, v. 20, n. 4 (June 2013).

    https://doi.org/10.1108/ecam-09-2011-0088

  8. Hosny, Ossama / Nassar, Khaled / Olusola, Peter Akinmoladun (2012): Decision Support System for Housing Developers in Developing Countries under Uncertain Buyer Behavior. In: Journal of Management in Engineering (ASCE), v. 28, n. 3 (July 2012).

    https://doi.org/10.1061/(asce)me.1943-5479.0000091

  9. Assad, Minass / Hosny, Ossama / Elhakeem, Ahmed / El Haggar, Salah (2013): Green building design in Egypt from cost and energy perspectives. In: Architectural Engineering and Design Management, v. 11, n. 1 (June 2013).

    https://doi.org/10.1080/17452007.2013.775100

  10. Nassar, Khaled / Hosny, Ossama (2012): Solving the Least-Cost Route Cut and Fill Sequencing Problem Using Particle Swarm. In: Journal of Construction Engineering and Management, v. 138, n. 8 (August 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000512

  11. Abotaleb, Ibrahim / Nassar, Khaled / Hosny, Ossama (2016): Layout optimization of construction site facilities with dynamic freeform geometric representations. In: Automation in Construction, v. 66 (June 2016).

    https://doi.org/10.1016/j.autcon.2016.02.007

  12. Nassar, Khaled / Hosny, Ossama (2013): Fuzzy clustering validity for contractor performance evaluation: Application to UAE contractors. In: Automation in Construction, v. 31 (May 2013).

    https://doi.org/10.1016/j.autcon.2012.11.013

  13. Hosny, Ossama / Elhakeem, Ahmed (2012): Simulating the winning bid: A generalized approach for optimum markup estimation. In: Automation in Construction, v. 22 (March 2012).

    https://doi.org/10.1016/j.autcon.2011.09.014

  14. Gouda, Ahmed / Hosny, Ossama / Nassar, Khaled (2017): Optimal crew routing for linear repetitive projects using graph theory. In: Automation in Construction, v. 81 (September 2017).

    https://doi.org/10.1016/j.autcon.2017.03.007

  15. Salah, Mohamed / Osman, Hesham / Hosny, Ossama (2018): Performance-Based Reliability-Centered Maintenance Planning for Hospital Facilities. In: Journal of Performance of Constructed Facilities (ASCE), v. 32, n. 1 (February 2018).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001112

  16. Abu Samra, Soliman / Osman, Hesham / Hosny, Ossama (2017): Optimal Maintenance and Rehabilitation Policies for Performance-Based Road Maintenance Contracts. In: Journal of Performance of Constructed Facilities (ASCE), v. 31, n. 1 (February 2017).

    https://doi.org/10.1061/(asce)cf.1943-5509.0000928

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine