Ossama Hosny
- Risk-Based Self-Improving Asset Management Framework for Coastal Protection Structures Using 1+ Inspection Points. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 38, n. 3 (juin 2024). (2024):
- Automated Management of Time Extension Claims. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 16, n. 2 (mai 2024). (2024):
- Integrated design optimization framework for green lightweight concrete. Dans: Journal of Building Engineering, v. 73 (août 2023). (2023):
- System Dynamics as an Assistive Tool to Delay Analysis in Identifying Productivity Losses. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 3 (août 2023). (2023):
- Framework for the Application of Blockchain Technology to Delay Analysis. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 2 (mai 2023). (2023):
- Development of an Assessment and Prediction Framework for Bridge Expansion Joints. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 49, n. 8 (1 août 2022). (2022):
- Prequalification of Egyptian construction contractors using fuzzy‐AHP models. Dans: Engineering, Construction and Architectural Management, v. 20, n. 4 (juin 2013). (2013):
- Decision Support System for Housing Developers in Developing Countries under Uncertain Buyer Behavior. Dans: Journal of Management in Engineering (ASCE), v. 28, n. 3 (juillet 2012). (2012):
- Green building design in Egypt from cost and energy perspectives. Dans: Architectural Engineering and Design Management, v. 11, n. 1 (juin 2013). (2013):
- Solving the Least-Cost Route Cut and Fill Sequencing Problem Using Particle Swarm. Dans: Journal of Construction Engineering and Management, v. 138, n. 8 (août 2012). (2012):
- Layout optimization of construction site facilities with dynamic freeform geometric representations. Dans: Automation in Construction, v. 66 (juin 2016). (2016):
- Fuzzy clustering validity for contractor performance evaluation: Application to UAE contractors. Dans: Automation in Construction, v. 31 (mai 2013). (2013):
- Simulating the winning bid: A generalized approach for optimum markup estimation. Dans: Automation in Construction, v. 22 (mars 2012). (2012):
- Optimal crew routing for linear repetitive projects using graph theory. Dans: Automation in Construction, v. 81 (septembre 2017). (2017):
- Performance-Based Reliability-Centered Maintenance Planning for Hospital Facilities. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 32, n. 1 (février 2018). (2018):
- Optimal Maintenance and Rehabilitation Policies for Performance-Based Road Maintenance Contracts. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 31, n. 1 (février 2017). (2017):