0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Zohar J. Herbsman

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Herbsman, Zohar J. / Tong Chen, Wei / Epstein, William C. (1995): Time Is Money: Innovative Contracting Methods in Highway Construction. In: Journal of Construction Engineering and Management, v. 121, n. 3 (September 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:3(273)

  2. Herbsman, Zohar J. (1995): A+B Bidding Method—Hidden Success Story for Highway Construction. In: Journal of Construction Engineering and Management, v. 121, n. 4 (December 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:4(430)

  3. Herbsman, Zohar J. / Glagola, Charles R. (1998): Lane Rental—Innovative Way to Reduce Road Construction Time. In: Journal of Construction Engineering and Management, v. 124, n. 5 (September 1998).

    https://doi.org/10.1061/(asce)0733-9364(1998)124:5(411)

  4. Chen, Hong-Long / O'Brien, William J. / Herbsman, Zohar J. (2005): Assessing the Accuracy of Cash Flow Models: The Significance of Payment Conditions. In: Journal of Construction Engineering and Management, v. 131, n. 6 (June 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:6(669)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine