Zohar J. Herbsman
- Time Is Money: Innovative Contracting Methods in Highway Construction. In: Journal of Construction Engineering and Management, v. 121, n. 3 (September 1995). (1995):
- A+B Bidding Method—Hidden Success Story for Highway Construction. In: Journal of Construction Engineering and Management, v. 121, n. 4 (Dezember 1995). (1995):
- Lane Rental—Innovative Way to Reduce Road Construction Time. In: Journal of Construction Engineering and Management, v. 124, n. 5 (September 1998). (1998):
- Assessing the Accuracy of Cash Flow Models: The Significance of Payment Conditions. In: Journal of Construction Engineering and Management, v. 131, n. 6 (Juni 2005). (2005):