Kathleen M. J. Harmon
- To Be or Not to BeāThat Is the Question: Is a DRB Right for Your Project?. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 3, n. 1 (February 2011). (2011):
- Loss of Productivity: Using the Leonard Study in Support of a Modified Total Cost Calculation. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 3 (August 2017). (2017):
- Conflicts between Owner and Contractors: Proposed Intervention Process. In: Journal of Management in Engineering (ASCE), v. 19, n. 3 (July 2003). (2003):
- Dispute Review Boards: Elements of a Convincing Recommendation. In: Journal of Professional Issues in Engineering Education and Practice, v. 130, n. 4 (October 2004). (2004):
- The Effective Mediator. In: Journal of Professional Issues in Engineering Education and Practice, v. 132, n. 4 (October 2006). (2006):
- Cost-Effective Strategies for Arbitration. In: Leadership and Management in Engineering (ASCE), v. 4, n. 4 (October 2004). (2004):
- Resolution of Construction Disputes: A Review of Current Methodologies. In: Leadership and Management in Engineering (ASCE), v. 3, n. 4 (October 2003). (2003):
- Effectiveness of Dispute Review Boards. In: Journal of Construction Engineering and Management, v. 129, n. 6 (December 2003). (2003):