Kathleen M. J. Harmon
- To Be or Not to Be—That Is the Question: Is a DRB Right for Your Project?. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 3, n. 1 (février 2011). (2011):
- Loss of Productivity: Using the Leonard Study in Support of a Modified Total Cost Calculation. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 3 (août 2017). (2017):
- Conflicts between Owner and Contractors: Proposed Intervention Process. Dans: Journal of Management in Engineering (ASCE), v. 19, n. 3 (juillet 2003). (2003):
- Dispute Review Boards: Elements of a Convincing Recommendation. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 130, n. 4 (octobre 2004). (2004):
- The Effective Mediator. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 132, n. 4 (octobre 2006). (2006):
- Cost-Effective Strategies for Arbitration. Dans: Leadership and Management in Engineering (ASCE), v. 4, n. 4 (octobre 2004). (2004):
- Resolution of Construction Disputes: A Review of Current Methodologies. Dans: Leadership and Management in Engineering (ASCE), v. 3, n. 4 (octobre 2003). (2003):
- Effectiveness of Dispute Review Boards. Dans: Journal of Construction Engineering and Management, v. 129, n. 6 (décembre 2003). (2003):