The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Hennings, William C. / Abdellatif, Sarah A. / Hanna, Awad S. (2022): Proper Risk Allocation: Force Majeure Clause. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 14, n. 1 (February 2022).

    https://doi.org/10.1061/(asce)la.1943-4170.0000527

  2. Lawrence, Samuel P. / Hanna, Awad S. / Russell, Jeffrey S. (1996): Performance of Polyethylene Parting Strips in PCC Pavements. In: Journal of Transportation Engineering, v. 122, n. 2 (March 1996).

    https://doi.org/10.1061/(asce)0733-947x(1996)122:2(155)

  3. Aiken, Jeffrey P. / Nassereddine, Hala / Hanna, Awad S. (2018): Implications of an Indemnification Clause in Construction Contracts. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 10, n. 3 (August 2018).

    https://doi.org/10.1061/(asce)la.1943-4170.0000270

  4. Hanna, Awad S. / Nassereddine, Hala / Swanson, Justin R. (2017): Proper Risk Allocation: NDFD Clause. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 2 (May 2017).

    https://doi.org/10.1061/(asce)la.1943-4170.0000208

  5. Hanna, Awad S. / Swanson, Justin R. / Aoun, Diane G. (2014): Proper Risk Allocation during Construction: Differing Site Conditions. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 6, n. 4 (November 2014).

    https://doi.org/10.1061/(asce)la.1943-4170.0000146

  6. Iskandar, Karim A. / Hanna, Awad S. / Lotfallah, Wafik (2019): Modeling the performance of healthcare construction projects. In: Engineering, Construction and Architectural Management, v. 26, n. 9 (September 2019).

    https://doi.org/10.1108/ecam-08-2018-0323

  7. Hanna, Awad S. / Senouci, Ahmed B. (1997): Material cost minimization of concrete wall forms. In: Building and Environment, v. 32, n. 1 (January 1997).

    https://doi.org/10.1016/s0360-1323(96)00037-6

  8. Thompson, Benjamin P. / Anderson, Stuart D. / Russell, Jeffrey S. / Hanna, Awad S. (2002): Guidelines for Warranty Contracting for Highway Construction. In: Journal of Management in Engineering (ASCE), v. 18, n. 3 (July 2002).

    https://doi.org/10.1061/(asce)0742-597x(2002)18:3(129)

  9. Chang, Chul-Ki / Hanna, Awad S. / Woo, Sungkwon / Cho, Chung-Suk (2019): Logistic Regression Modeling to Determine Projects impacted by Schedule Compression. In: KSCE Journal of Civil Engineering, v. 23, n. 4 (March 2019).

    https://doi.org/10.1007/s12205-019-2056-0

  10. Hanna, Awad S. / Willenbrock, Jack H. / Sanvido, Victor E. (1992): Knowledge Acquisition and Development for Formwork Selection System. In: Journal of Construction Engineering and Management, v. 118, n. 1 (March 1992).

    https://doi.org/10.1061/(asce)0733-9364(1992)118:1(179)

  11. Hanna, Awad S. / Russell, Jeffrey S. / Nordheim, Erik V. / Bruggink, Matthew J. (1999): Impact of Change Orders on Labor Efficiency for Electrical Construction. In: Journal of Construction Engineering and Management, v. 125, n. 4 (August 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:4(224)

  12. Hanna, Awad S. / Russell, Jeffrey S. / Gotzion, Timothy W. / Nordheim, Erik V. (1999): Impact of Change Orders on Labor Efficiency for Mechanical Construction. In: Journal of Construction Engineering and Management, v. 125, n. 3 (June 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:3(176)

  13. Hanna, Awad S. / Gunduz, Murat (2004): Impact of Change Orders on Small Labor-Intensive Projects. In: Journal of Construction Engineering and Management, v. 130, n. 5 (October 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:5(726)

  14. Hanna, Awad S. / Taylor, Craig S. / Sullivan, Kenneth T. (2005): Impact of Extended Overtime on Construction Labor Productivity. In: Journal of Construction Engineering and Management, v. 131, n. 6 (June 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:6(734)

  15. Hanna, Awad S. / Iskandar, Karim A. (2017): Quantifying and Modeling the Cumulative Impact of Change Orders. In: Journal of Construction Engineering and Management, v. 143, n. 10 (October 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001385

  16. El Asmar, Mounir / Hanna, Awad S. / Whited, Gary C. (2011): New Approach to Developing Conceptual Cost Estimates for Highway Projects. In: Journal of Construction Engineering and Management, v. 137, n. 11 (November 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000355

  17. Hanna, Awad S. / Lotfallah, Wafik B. (1999): A fuzzy logic approach to the selection of cranes. In: Automation in Construction, v. 8, n. 5 (June 1999).

    https://doi.org/10.1016/s0926-5805(99)00009-6

  18. Hanna, Awad S. / Lotfallah, Wafik / Aoun, Diane G. / El Asmar, Mounir (2014): Mathematical Formulation of the Project Quarterback Rating: New Framework to Assess Construction Project Performance. In: Journal of Construction Engineering and Management, v. 140, n. 8 (August 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000871

  19. Noyce, David A. / Hanna, Awad S. (1997): Planned Schedule Compression Concept File For Electrical Contractors. In: Journal of Construction Engineering and Management, v. 123, n. 2 (June 1997).

    https://doi.org/10.1061/(asce)0733-9364(1997)123:2(189)

  20. El Asmar, Mounir / Hanna, Awad S. / Chang, Chul-Ki (2009): Monte Carlo Simulation Approach to Support Alliance Team Selection. In: Journal of Construction Engineering and Management, v. 135, n. 10 (October 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000074

  21. Hanna, Awad S. / Chang, Chul-Ki / Lackney, Jeffery A. / Sullivan, Kenneth T. (2007): Impact of Overmanning on Mechanical and Sheet Metal Labor Productivity. In: Journal of Construction Engineering and Management, v. 133, n. 1 (January 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:1(22)

  22. Menches, Cindy L. / Hanna, Awad S. / Nordheim, Erik V. / Russell, Jeffrey S. (2008): Impact of pre‐construction planning and project characteristics on performance in the US electrical construction industry. In: Construction Management and Economics, v. 26, n. 8 (August 2008).

    https://doi.org/10.1080/01446190802213511

  23. Noyce, David A. / Hanna, Awad S. (1998): Planned and unplanned schedule compression: the impact on labour. In: Construction Management and Economics, v. 16, n. 1 (January 1998).

    https://doi.org/10.1080/014461998372619

  24. Hanna, Awad S. / Russell, Jeffrey S. / Vandenberg, Paul J. (1999): The impact of change orders on mechanical construction labour efficiency. In: Construction Management and Economics, v. 17, n. 6 (November 1999).

    https://doi.org/10.1080/014461999371060

  25. Hanna, Paulette B. / Hanna, Awad S. / Papagiannakis, Thomas A. (1993): Knowledge-based advisory system for flexible pavement routine maintenance. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 20, n. 1 (February 1993).

    https://doi.org/10.1139/l93-016

  26. Hanna, Awad S. / Senouci, Ahmed B. (1995): NEUROSLAB – neural network system for horizontal formwork selection. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 22, n. 4 (August 1995).

    https://doi.org/10.1139/l95-088

  27. Hanna, Awad S. / Shapira, Aviad / El Asmar, Mounir / Taylor, Craig S. (2013): Impact of Crew Scheduling on Project Performance. In: Practice Periodical on Structural Design and Construction, v. 18, n. 1 (February 2013).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000121

  28. Hanna, Awad S. / Chang, Chul-Ki / Sullivan, Kenneth T. / Lackney, Jeffery A. (2008): Impact of Shift Work on Labor Productivity for Labor Intensive Contractor. In: Journal of Construction Engineering and Management, v. 134, n. 3 (March 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:3(197)

  29. Hanna, Awad S. / Ibrahim, Michael W. / Lotfallah, Wafik / Iskandar, Karim A. / Russell, Jeffrey S. (2016): Modeling Project Manager Competency: An Integrated Mathematical Approach. In: Journal of Construction Engineering and Management, v. 142, n. 8 (August 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001141

  30. Ammar, Abdurahman / Hanna, Awad S. / Nordheim, Erik V. / Russell, Jeffrey S. (2003): Indicator Variables Model of Firm's Size-Profitability Relationship of Electrical Contractors Using Financial and Economic Data. In: Journal of Construction Engineering and Management, v. 129, n. 2 (March - April 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:2(192)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine