La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Aboseif, Eyad / Hanna, Awad S.: Benchmarking of construction projects performance for comparative assessment and performance improvement: a statistical quantitative approach. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-06-2022-0552

  2. Hanna, Awad S. / Aboseif, Eyad (2023): Clarifying Design Responsibility and Its Risk Allocation in Construction Contracts. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 2 (mai 2023).

    https://doi.org/10.1061/jladah.ladr-812

  3. Aboseif, Eyad / Hanna, Awad S. (2023): Defining the Success Status of Construction Projects Based on Quantitative Performance Metrics Thresholds. Dans: Journal of Management in Engineering (ASCE), v. 39, n. 2 (mars 2023).

    https://doi.org/10.1061/jmenea.meeng-5123

  4. Nassereddine, Hala / Hanna, Awad S. / Veeramani, Dharmaraj / Lotfallah, Wafik (2022): Augmented Reality in the Construction Industry: Use-Cases, Benefits, Obstacles, and Future Trends. Dans: Frontiers in Built Environment, v. 8 (février 2022).

    https://doi.org/10.3389/fbuil.2022.730094

  5. Nassereddine, Hala / Veeramani, Dharmaraj / Hanna, Awad S. (2022): Design, Development, and Validation of an Augmented Reality-Enabled Production Strategy Process. Dans: Frontiers in Built Environment, v. 8 (février 2022).

    https://doi.org/10.3389/fbuil.2022.730098

  6. Hanna, Awad S. / Iskandar, Karim A. / Lotfallah, Wafik (2019): Benchmarking project performance: a guideline for assessing vulnerability of mechanical and electrical projects to productivity loss. Dans: Construction Management and Economics, v. 37, n. 2 (février 2019).

    https://doi.org/10.1080/01446193.2018.1513160

  7. Kumar, Vellanki S. S. / Hanna, Awad S. / Adams, Teresa (2000): Assessment of working capital requirements by fuzzy set theory. Dans: Engineering, Construction and Architectural Management, v. 7, n. 1 (janvier 2000).

    https://doi.org/10.1108/eb021135

  8. Labib, Youssef N. / Lotfallah, Wafik B. / Hanna, Awad S. / Boulos, Nabil W. (2021): Development and Application of Performance Index for Comparative Assessment of Public Capital Projects. Dans: Journal of Construction Engineering and Management, v. 147, n. 2 (février 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0001992

  9. Ibrahim, Michael W. / Labib, Youssef / Veeramani, Dharmaraj / Hanna, Awad S. / Russell, Jeffrey (2021): Comprehensive Model for Construction Readiness Assessment. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 1 (janvier 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000832

  10. Ibrahim, Michael W. / Hanna, Awad S. / Russell, Jeffrey S. / Abotaleb, Ibrahim S. / El-adaway, Islam H. (2020): Comprehensive Analysis of Factors Associated with Out-of-Sequence Construction. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 4 (juillet 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000777

  11. Abotaleb, Ibrahim S. / El-adaway, Islam H. / Ibrahim, Michael W. / Hanna, Awad S. / Russell, Jeffrey S. (2020): Developing a Rating Score for Out-of-Sequence Construction. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 3 (mai 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000765

  12. Gunduz, Murat / Hanna, Awad S. (2005): Benchmarking change order impacts on productivity for electrical and mechanical projects. Dans: Building and Environment, v. 40, n. 8 (août 2005).

    https://doi.org/10.1016/j.buildenv.2004.10.004

  13. Abotaleb, Ibrahim S. / El-adaway, Islam H. / Ibrahim, Michael W. / Hanna, Awad S. / Russell, Jeffrey S. (2019): Causes, Early Warning Signs, and Impacts of Out-of-Sequence Construction: Expert-Based Survey Analysis. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 6 (novembre 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000724

  14. Hanna, Awad S. / Sullivan, Kenneth T. (2005): Bridging the Gap between Academics and Practice: A Capstone Design Experience. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 131, n. 1 (janvier 2005).

    https://doi.org/10.1061/(asce)1052-3928(2005)131:1(59)

  15. Lee, Min-jae / Hanna, Awad S. / Loh, Wei-Yin (2004): Decision Tree Approach to Classify and Quantify Cumulative Impact of Change Orders on Productivity. Dans: Journal of Computing in Civil Engineering, v. 18, n. 2 (avril 2004).

    https://doi.org/10.1061/(asce)0887-3801(2004)18:2(132)

  16. Hanna, Awad S. / Senouci, Ahmed B. (1995): Design Optimization of Concrete-Slab Forms. Dans: Journal of Construction Engineering and Management, v. 121, n. 2 (juin 1995).

    https://doi.org/10.1061/(asce)0733-9364(1995)121:2(215)

  17. Hanna, Awad S. / Thomas, Greg / Swanson, Justin R. (2013): Construction Risk Identification and Allocation: Cooperative Approach. Dans: Journal of Construction Engineering and Management, v. 139, n. 9 (septembre 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000703

  18. Krishnamurthy, Bharath K. / Tserng, Hui-Ping / Schmitt, Robert L. / Russell, Jeffrey S. / Bahia, Hussain U. / Hanna, Awad S. (1998): AutoPave: towards an automated paving system for asphalt pavement compaction operations. Dans: Automation in Construction, v. 8, n. 2 (décembre 1998).

    https://doi.org/10.1016/s0926-5805(98)00060-0

  19. Hanna, Awad S. / Skiffington, Mark A. (2010): Effect of Preconstruction Planning Effort on Sheet Metal Project Performance. Dans: Journal of Construction Engineering and Management, v. 136, n. 2 (février 2010).

    https://doi.org/10.1061/(asce)0733-9364(2010)136:2(235)

  20. Hanna, Awad S. / Peterson, Pehr / Lee, Min-jae (2002): Benchmarking Productivity Indicators for Electrical/Mechanical Projects. Dans: Journal of Construction Engineering and Management, v. 128, n. 4 (août 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:4(331)

  21. Hanna, Awad S. / Menches, Cindy L. / Sullivan, Kenneth T. / Sargent, Joseph R. (2005): Factors Affecting Absenteeism in Electrical Construction. Dans: Journal of Construction Engineering and Management, v. 131, n. 11 (novembre 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:11(1212)

  22. Hanna, Awad S. / Camlic, Richard / Peterson, Pehr A. / Lee, Min-jae (2004): Cumulative Effect of Project Changes for Electrical and Mechanical Construction. Dans: Journal of Construction Engineering and Management, v. 130, n. 6 (décembre 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:6(762)

  23. Menches, Cindy L. / Hanna, Awad S. (2006): Conceptual Planning Process for Electrical Construction. Dans: Journal of Construction Engineering and Management, v. 132, n. 12 (décembre 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:12(1306)

  24. Karlsson, Mary / Lakka, Antti / Sulankivi, Kristiina / Hanna, Awad S. / Thompson, Benjamin P. (2008): Best Practices for Integrating the Concurrent Engineering Environment into Multipartner Project Management. Dans: Journal of Construction Engineering and Management, v. 134, n. 4 (avril 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:4(289)

  25. El Asmar, Mounir / Hanna, Awad S. / Loh, Wei-Yin (2016): Evaluating Integrated Project Delivery Using the Project Quarterback Rating. Dans: Journal of Construction Engineering and Management, v. 142, n. 1 (janvier 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001015

  26. Smith, Gary R. / Hanna, Awad S. (1993): Factors influencing formwork productivity. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 20, n. 1 (février 1993).

    https://doi.org/10.1139/l93-015

  27. Abou-Zeid, Azza / Russell, Jeffrey S. / Hanna, Awad S. / Park, Sang C. (1995): Data flow model for communications between project participants in a highway bridge project. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 22, n. 6 (décembre 1995).

    https://doi.org/10.1139/l95-140

  28. Hanna, Awad S. / Gunduz, Murat (2005): Early warning signs for distressed projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 32, n. 5 (octobre 2005).

    https://doi.org/10.1139/l05-032

  29. Hanna, Awad S. (2016): Benchmark Performance Metrics for Integrated Project Delivery. Dans: Journal of Construction Engineering and Management, v. 142, n. 9 (septembre 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001151

  30. Hanna, Awad S. / Iskandar, Karim A. / Lotfallah, Wafik / Ibrahim, Michael W. / Russell, Jeffrey S. (2018): data-driven approach for identifying project manager competency weights. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 45, n. 1 (janvier 2018).

    https://doi.org/10.1139/cjce-2017-0237

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine